Laserfiche WebLink
w ~ ~^ ~ ~ ~^ ~^^ ~wis w ~ ~ ~ ~ ~ ~ ^u ^ a i - <br />_ - --- <br />Courthouse Square Architectural Cost Consultants, LLC - _ -- - _ _ <br />Estimate Date: R21-Aug-98 <br />Couft & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98 <br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98 <br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM <br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 __ _ _ Construction Start: Spring 99 <br />_ _ ___ _. <br />Parking Level One 70,793 _ <br />__ -- --- - - <br />Gross Area 70,793 sf <br />- _. <br />__ _ --- - - -- - - --- - ~. , <br />Parkin~ ~uantity Unit CosUUnit Cost Total --- - - - - - _ _ <br />Comments <br /> <br />I <br />I <br />CONCRETE - Continued ~ _ _ __ _ _ _--- ---- -- --- _ . _ _ <br /> finishing <br /> set screeds 185,895 sf 0.20 37,179 37,179 <br /> cure 185,895 sf 0.08 14,872 14,872 <br /> seal 185,895 sf 0.06 11,154 11,154 <br /> trowel 113,538 sf 0.60 68,123 68,123 <br /> float slab 72,357 sf 0.40 28,943 14,471 14,471 0 <br /> finish topping slabs <br /> 3" @ drive lane 14,356 sf 0.45 6,460 6,460 <br /> 3" It weight 24,728 sf 0.45 11,128 11,128 <br /> 3" @ building plaza 7,988 sf 0.45 3,595 3,595 <br /> float footings 2,660 sf 0.40 1,064 1,064 <br /> break ties & plug voids @ walls 25,705 sf 0.55 14,138 <br />- 14,138 <br /> Subtotal - _ <br />196,654 14,471 - <br />14,471 167,711 <br /> Miscellaneous ~ <br />; waterstop 1,116 If 4.50 5,022 5,022 <br />'~ house keeping pads ; 300 sf 8.00 2,400 2,400 <br />' Subtotal ~~ -- --- - 7,422 0 0 7,422 i <br /> Precast Concrete <br /> ! precast wheel stops 192 ea 0.00 <br />0 <br />I 0 NIC <br /> i Subtotal _ <br />_____ <br />, <br />0 <br />I 0 0 0 I <br /> _ _ _--- _ _ <br />f TOTAL - CONCRETE <br />1 _ . - - - - -- _ _ __ - --- -- - --- <br />51,586,655 $399,374 $399.374 $787,907 __ 22.41 _ ___ <br /> _-- - - ____ _ _ __ ___ --- _-__ .. _ - <br />_ _ __ _ _ _ <br />MASONRY _ _ _ _ --- --- __--- <br />Concrete Masonry Units (CMU) <br />6" partitions 4,910 sf 8.50 41,735 41,735 storage 8~ lobby walls <br />north ramp wall (for veneer backup) 1,080 sf 8.50 9,180 9,180 verify <br />Subtotal 50,915 0 0 50,915 <br />915 $0 _ __ $0 $50,915 0.72 <br />TOTAL - MASONRY 550, <br />Parking Detail Estimate - Page 5 <br />