<br />Courthouse Square Architectural Cost Consultants, LLC - _ -- - _ _
<br />Estimate Date: R21-Aug-98
<br />Couft & High Street James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />Salem, Oregon 6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Arbuckle Costic Architects, Inc Portland, Oregon 97221 Print Time: 11:20 AM
<br />Design Development Probable Cost Estimate Phone (503) 297-7210 Fax (503) 297-7187 __ _ _ Construction Start: Spring 99
<br />_ _ ___ _.
<br />Parking Level One 70,793 _
<br />__ -- --- - -
<br />Gross Area 70,793 sf
<br />- _.
<br />__ _ --- - - -- - - --- - ~. ,
<br />Parkin~ ~uantity Unit CosUUnit Cost Total --- - - - - - _ _
<br />Comments
<br />
<br />I
<br />I
<br />CONCRETE - Continued ~ _ _ __ _ _ _--- ---- -- --- _ . _ _
<br /> finishing
<br /> set screeds 185,895 sf 0.20 37,179 37,179
<br /> cure 185,895 sf 0.08 14,872 14,872
<br /> seal 185,895 sf 0.06 11,154 11,154
<br /> trowel 113,538 sf 0.60 68,123 68,123
<br /> float slab 72,357 sf 0.40 28,943 14,471 14,471 0
<br /> finish topping slabs
<br /> 3" @ drive lane 14,356 sf 0.45 6,460 6,460
<br /> 3" It weight 24,728 sf 0.45 11,128 11,128
<br /> 3" @ building plaza 7,988 sf 0.45 3,595 3,595
<br /> float footings 2,660 sf 0.40 1,064 1,064
<br /> break ties & plug voids @ walls 25,705 sf 0.55 14,138
<br />- 14,138
<br /> Subtotal - _
<br />196,654 14,471 -
<br />14,471 167,711
<br /> Miscellaneous ~
<br />; waterstop 1,116 If 4.50 5,022 5,022
<br />'~ house keeping pads ; 300 sf 8.00 2,400 2,400
<br />' Subtotal ~~ -- --- - 7,422 0 0 7,422 i
<br /> Precast Concrete
<br /> ! precast wheel stops 192 ea 0.00
<br />0
<br />I 0 NIC
<br /> i Subtotal _
<br />_____
<br />,
<br />0
<br />I 0 0 0 I
<br /> _ _ _--- _ _
<br />f TOTAL - CONCRETE
<br />1 _ . - - - - -- _ _ __ - --- -- - ---
<br />51,586,655 $399,374 $399.374 $787,907 __ 22.41 _ ___
<br /> _-- - - ____ _ _ __ ___ --- _-__ .. _ -
<br />_ _ __ _ _ _
<br />MASONRY _ _ _ _ --- --- __---
<br />Concrete Masonry Units (CMU)
<br />6" partitions 4,910 sf 8.50 41,735 41,735 storage 8~ lobby walls
<br />north ramp wall (for veneer backup) 1,080 sf 8.50 9,180 9,180 verify
<br />Subtotal 50,915 0 0 50,915
<br />915 $0 _ __ $0 $50,915 0.72
<br />TOTAL - MASONRY 550,