Courthouse Square
<br />Court & High Street
<br />Salem, Oregon
<br />Arbuckle Costic Architects, Inc
<br />Design Development Probable Cost Estimate
<br />Parking Level One
<br />Gross Area
<br />Parkin~
<br />CONCRETE - Continued
<br />Placing - Continued
<br />beams
<br />supported slab
<br />parking ramp
<br />curbs
<br />concrete topping
<br />3" @ drive lane
<br />3" It weight
<br />3" @ building plaza
<br />~ pumping
<br />' Subtotal - Placing
<br />I
<br />redi-mix concrete
<br />, spread footings 3000 psi
<br />continuous footing 3000 psi
<br />~i ramp wall 3000 psi
<br />slab on grade 4000 psi
<br />; fibermesh - 3# / cy
<br />columns 5000 psi
<br />walls
<br />I basement 5000 psi
<br />ramp wall 5000 psi
<br />beams 5000 psi
<br />, supported slab 5000 psi
<br />parking ramp 5000 psi
<br />fiber mesh - 3# / cy
<br />'i curbs 5000 psi
<br />concrete topping
<br />3" @ drive lane 3000 psi
<br />I 3" It weight 3000 psi
<br />, 3" @ building plaza 3000 psi
<br />'~ Subtotal - Redi-Mix Concrete
<br />__ __
<br />ArChiteCtural COSt ConSUltants, LLC _ . __ .
<br />Estimate Date: R21-Aug-98
<br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA Document Date: 23-Ju1-98
<br />6441 SW Canyon Court, Suite 103 Print Date: 21-Aug-98
<br />Portland, Oregon 97221 Print Time: 11:20 AM
<br />Phone (503) 297-7210 Fax (503) 297-7187 _ Construction Start: Spring 99
<br />- - __ _---- -__ _ __._
<br />_
<br />70,793
<br />_ ___ __
<br />- -
<br />
<br />_
<br />----
<br />70,793 sf
<br />_ -- ~,,;,,, ,,,,, ,,;~,,,.,
<br />Quantit~r Unit CosUUnit Cost Total > ~~ Comments
<br />cy 45.00 0
<br />2,083 cy 16.00 33,328
<br />73 cy 16.00 1,168
<br />0 cy 50.00 0
<br />140 cy 30.00 4,200
<br />240 cy 30.00 7,200
<br />78 cy 30.00 2,340
<br />4,482 cy 10.00
<br />-- 44,820
<br />- -- -
<br />.
<br /> 128,987
<br />16,664 ~ 16,664
<br />10,415 10,415
<br />27,079 27,079
<br />0 NIC
<br />0
<br />1,168
<br />0 NIC
<br />4,200
<br />7,200
<br />2,340
<br />23,990
<br />175 cy 54.00 9,450
<br />329 cy 54.00 17,766
<br />8 cy 54.00 432
<br />917 cy 58.00 53,186
<br />917 cy 14.00 12,838
<br />22 cy 64.00 1,408
<br />393 cy 64.00 25,152
<br />24 cy 64.00 1,536
<br />0 cy 64.00 0
<br />2,083 cy 64.00 133,312
<br />73 cy 64.00 4,672
<br />2,156 cy 14.00 30,184
<br />0 cy 64.00 0
<br />140 cy 54.00 7,560
<br />240 cy 115.00 27,600
<br />78 cy 54.00
<br />_ 4,212
<br />_ --
<br />4,482 cy 329,308
<br />66,656 66,656
<br />14,581 14,581
<br />
<br />81,237 81,237
<br />74.829
<br />9,450
<br />17,766
<br />432
<br />53,186
<br />12,838
<br />1,408
<br />25,152
<br />1,536
<br />0
<br />0
<br />4,672
<br />1,022
<br />0
<br />7,560
<br />27,600
<br />4,212
<br />166,834
<br />Parking Detail Estimate - Page 4