My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br />~ <br />with 2 tenancies maybe 3. Dave will represent nothing planned in shell. <br />Sheetrock interior walls? Yes it makes sense. Firestops between floors wil~ have beazing, <br />since the wall will hang on outside of floor. County assumed this is in shell co~t. Pence Kelly <br />has written definitions of what's in shell package. Dave and Leonard to sit dov~tn and work out <br />this area of concern. County is starting to work on TI issue and what our $$', will buy us, it <br />maybe a combination of completing some spaces and leaving some open. <br />Skylights - Skylights have been reduced and the strip skylights removed fro~ plan. Pence <br />Kelly took completely out and thought Dan had all skylights out of budget. Wh~n Dave priced <br />roof garden, put add in cost for skylights. County and Tra.nsit both have conce~rn that there is <br />nothing to tell us what the $52 shell cost is. ' <br />Randy raised concems about the architect and contractor being able to obtain infiormation from <br />Dan to clarify information on budgets in light of recent developments. Pence I~elly has letter <br />and list summarizing costs and how the budget was prepared. He will hav$ this material <br />available. <br />Item #5 Additional cross section - the pavers used are spendy. Try and look for something less <br />expensive. <br />Item #6 <br />changes. <br />the mall <br />being worked on. <br />, <br />Item #8 Beam sizes were reduced but not eliminated - more later. <br />Item #9 Mike to do budget based on early sketches or Dave's recollection was b~sed on phone <br />conversation. The scheme solves problems. Guttering and double columns help ~in stability of <br />system. With the walking plank you can clean from it. <br />on the inset on the 4te tloo~ on eaterior <br />The goal is to simplify trea~tment on the <br />and overhangs have been eli~inated. The <br />architect has worked to streamline the outer structure. We want to invest our dolla~-s on the first <br />floor, and where it will be noticed and then simplify the outer structure. The ar~hitect would <br />like to work with different aspects and look at what is available and what we cajn use. It's a <br />good time to talk now and develop budgets. ' <br />Did we resolve the questions we had last week <br />windows? We brought the windows out more. <br />outside and eliminate the fine detail. All ledges <br />Meeting adjourned. <br />The roof pla.n is being working on. We can go over window syst~m with other <br />We reduced difficulty on skin, and hope to reduce all numbers. The ~levations into <br />were fairly generic. We will deal with this later. Dave needs a glass ~pec and it is <br />~In~' <br />
The URL can be used to link to this page
Your browser does not support the video tag.