My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ from once they are on-site. Also is there office space available either on the block or in the area <br />to rent. The project manager will require space as well. Curt asked if they could put trailers on <br />Courthouse property. This would not be feasible. Discussions were held about putting them in <br />the perimeter of the site. They aze looking at possibly 7-8 trailers plus they will need room for <br />theu equipment (hoisting cranes, etc.) as well. It was suggested that Gene Derfl~er has property <br />(the old Grand Theater above the current Transit space) that may be available for ~ent. <br />The option of possibly closing one lane of traffic on Chemeketa. and/or High was discussed. <br />Since all buses use Chemeketa & Court let's look at using one lane and parking spaces on High <br />Street. We currently have request for a permit for closing off parking azeas on High Street in <br />with the city right now. It is recommended that we e~rtend this permit for as lqng as we can. <br />Dave will check with the city on e~rtending the demolition permit to have access ~o one lane and <br />the pazking areas on High Street. The buses need at least 80 feet from sign on the crosswalk on <br />High to have access into their bus lanes. <br />Would like to see some signage go up once we start construction. It creates interest in the <br />project. Curt will get approval from the group before they are done. <br />Demolition update <br />The fencing went up today on schedule. Staton is not performing under the provisions of the <br />contract. They have not given us scheduling and plans as required by contract. County is in the <br />process of sending letters off to them. We will hire Centurywest as temporary ptoject manager <br />to monitor demolition, environmental issues, safety plans, etc. There will be hazardous <br />materials discovered as building is opened. These issues will need monitoring. Another <br />$73,000 should carry us through for project management portion to be added to Centurywest's <br />contract. It was not known if the demolition permit has been received from the ~ity. Staton is <br />ready to do the work, but they are not providing us with the documentation as required by their <br />contract. Curt will make a follow-up phone call to Staton to see what is going on. <br />Issue on skylights <br />Dan was asked what he recalled happened on the skylight issue. Dan stated that the skylights are <br />not in the current budget. This process was started and never finished. The atrp~im design on <br />the 4`~ floor was designed as an option, but don't think it is penciled into the $52 sft shell cost. <br />They were in the plans, then removed, but remained on the drawings, but not in~ the budgets. <br />We asked for these things as options: roof gardens, patio, skylights. RG not~d that all the <br />interior design was being done on the basis that the skylights are there. Dave will take a look at <br />what the cost factor is and re-analyze how it looks today. Discussions were held regarding <br />$80,000 cost for strip skylights not going through the floor. Due to potential cade issues, we <br />will look at skylights only going to 3rd floor. Need to keep in mind sound and siecurity issues <br />with skylights as well. <br />Budget <br />Transit is still too close to budget and would like a little more leeway. There are additional <br />~ consulting fees that were not in Transit's numbers originally and the e~ra parking spaces were <br />Page 5 of 6 <br />