Laserfiche WebLink
Courthouse Square - Qualifications/Exclusions <br />Page 2 <br />~ <br />~ <br />7. Architectural and engineering fees by owner <br />8. Exhaust or fans at bus mall area <br />9. Fire proofing of steel I <br />10. Site fumishings at bus mall ' <br />11. Planters or any landscaping at bus mall area <br />12. Environmental clean-up or testing <br />13. Asbestos removal <br />14. Piling or bank shoring - we assume we can cut the banks back as ne~eded to <br />accommodate construction ' <br />15. Heat under ground level concrete ', <br />16. Dewatering engineering ' <br />17. Irrigation <br />18. Building signage other than required by code ', <br />19. Street lights or other street improvements other than the new street ~cape work on <br />the block of the project ' <br />20. Painting of concrete at basement ' <br />21. Fumishings by owner <br />22. Landscape partitions by owner <br />23. Casework in shell price or TI cost , <br />24. Cost for using parking spaces on the block being constructed ' <br />25. Security separation at floor to floor openings ' <br />26. Wood trim at perimeter walls ' <br />27. Sheetrock at interior of exterior walls i <br />28. Streetscape cost (budget add at $1,315,889 per scope dated 2/14/9~) <br />29. Sunscreens I~ <br />Revised 6/5/97 <br />