My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Courthouse Square I'~~ ~ <br />Qualifications/Exclusions I, ~ <br />~ <br />This estimate based on pians dated May 30, 1997. , <br />INCLUSIONS <br />1. Tile on walis at bus mall up 8' <br />2. Security grills at bus entrances, ramp, service, breezeways (seven tatal) <br />3. 20% common area finished in base bid - the 20% includes bathroomfi, elevators, <br /> hallways and lobbies. The finished space is 35,000 sq. ft. ' <br />4. Exhaust from parking structure is vented through three chases at bu$ mall level <br /> and louvered out of the wall at 10' above the bus mall floor <br />5. We have included the four clock faces at a cost of $40,000 , <br />6. Allowance of $125,000 for all permits, development fees, water metejrs, sewer <br /> charges, street closings or any other govemmental costs , <br />7. Owner to provide space for P/K yard and trailer , <br />8. Minimum sack and patch of concrete at basement I <br />9. Testing $100,000 allowance ' <br />10. Tile at entry 1~ floor and bathrooms only , <br />11. $33,000 for graffiti protection at 1g` floor and parking structure , <br />12. Co-ray vac heat under bus shelters <br />h <br />~ 13. Hard ceiling under building where buses pass throug <br />14. Performance and payment bonds (allowance $250,000) <br />15. Dewatering allowance at $40,000 <br />16. Pavers at bus mall per 8/12/96 drawing <br />17. Pavers at roof garden ', <br />18. Skylights at roof and related openings/soffits <br />19. Precast bullnose at second floor level (allowance $25,000) <br />20. Parking garage figured per 377 stall drawing dated 5/22/97 <br />21. 4" masonry veneer in lieu of marble <br />~ 22. Sheet metal canopies in streetscape <br />23. All elevators traction type ', <br />24. Dryvit skin at courtroom raised roof section , <br />25. $175,000 budget for security grilles at ground floor <br />26. $500,000 contingency <br />EXCLUSIONS <br />1. Security system by owner <br />2. Phone system and wiring by owner <br />3. Data system and wiring by owner <br />4. Sound system and PA system by owner <br />5. Soils testing by owner <br />~ 6. Demolition of existing structures by owner <br />Revised 6/5/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.