. <br />Another point to bear in mind is that we don't know the effect the waterflow will have without <br />~ knowing what pressures we are dealing with and how they will affect the building, <br />Can we get the pump tests completed by someone else sooner or reinforce ~he urgency to <br />GRI to get this completed right away? Westerberg from Mollala is the subContractor who <br />will be drilling. Can Pence Kelly provide the service to drill and put in the casing? If <br />Pence Kelly has specifications, Curt can make calls to see if they can see about availability to get <br />it completed. <br />Additional discussion followed regarding options of coping with a possible 2 month delay, <br />impact of changing to a single story pazking structure and possibly adding one to two levels on a <br />County owned parking structure across the street and the upgrades required to accomplish this <br />task. <br />Centurywest had meetings this morning with Sta.ton Construction and Jody McCqnnell, Marion <br />County Solid Waste and then had a meeting with Melvin Mazk. It was suggested that Melvin <br />Mark initiate a meeting with Staton Construction as well. <br />Discussions went back to who would be signing the contract with GRI for the pump tests. GRI <br />was recommended as the company with the best history and know how in thi~ area by the <br />structural engineer. Centurywest indicated that the environmental information is secondary and <br />~ probably not in Centurywest's best interest to be involved in this phase. The custpm is that the <br />geotech would work for the owner. The architect is not the appropriate place biecause of the <br />impact of structural design. The de-watering package will be completed for the purpose of the <br />design. If we know total volume and then quality of water it will put us in a bett~r direction to <br />proceed with the project. <br />The meeting was recessed for 20 minutes so the building owners and project management <br />company would discuss the situation to determine the best possible approach on the GRI <br />proposal. Centurywest and Pence Kelly also made phone contacts to see if the purnp tests could <br />be completed sooner. Other discussions on how to solve the problem or what options are <br />available were discussed between the remaining attendees. <br />The meeting was reconvened and it was determined that the project has a seriqus problem. <br />There is missing data that affects the design of the structure and time of the project. It has to be <br />done. The decision was made that County would sign the contract with GRI and'Centurywest <br />would act as project manager for this test. This delay during the testing will affe¢t other team <br />members. Melvin Mark is working on getting up-to-speed on the project and will need another <br />week to get all aspects under control. The question is what can or should prpceed in the <br />meantime while we wait for this information to be completed? The architect ~vould like to <br />continue with design development documents for the contractor. There are other aspects that <br />can be worked on that would be unaffected by the design of the parking structure. '~he concerns <br />of completing too much work and if the worst case scenario develops of a one level garage with <br />~'` Page 4 of 5 <br />