My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Team Meeting Notes (96-99)
>
CS_Courthouse Square
>
Development Team Meeting Notes (96-99)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:47:33 AM
Creation date
9/6/2011 10:03:43 AM
Metadata
Fields
Template:
Building
RecordID
10302
Title
Development Team Meeting Notes (96-99)
BLDG Date
8/19/1997
Building
Courthouse Square
BLDG Document Type
Committee
Project ID
CS9601 Courthouse Square Research
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7-3 Byron and Ron will work with Leonard and Dave to compare the latest DI~ plans with <br />~ Dave's budget. Starting next week they will meet prior to the developmerit team <br />meeting. ACTION: Byron, Ron, Leonard and Dave to meet. <br />ONGOING ISSUES <br />Acoustical / Vibration ' <br />6-27 MMDC recommended that we bring on an acoustical consultant to assist i~ addressing <br />sound isolation issues. MMDC has contacted Russ Altermatt and Associa~es. Russ can <br />prepare a budget after reviewing structural and azchitectural plans. ACTI(.~N: MMDC <br />will contact Russ to request a proposal. Rev. 7-3 MMDC to transmit pl~ns to Russ and <br />discuss scope of proposal. <br />6-27 In response to Dan's memo concerning post tension construction and bus vibration- Mike <br />Hayford has isolated the bus breezeway from the offices to isolate vibratioh. Rev. 7-3 <br />Russ Altermatt to include vibration isolation as an option in his proposal. ' <br />Permitting <br />6-27 Leonard is arranging a pre-application and code review conference with th~ City. Dan <br />would like to have a MMDC team member attend. ACTION: Leonazd to ~et a date for <br />the conference. Rev. 7-3 Leonard set meeting with the City for 10:00 `l~hursday, July <br />10. <br />~ <br />6-27 Craig expressed a concern with adequate budget coverage of permits and f~es. The team <br />discussed some specific permit and fees, e.g. sewer and water hookup, traf~ic impact, <br />building permits, etc. Dave indicated that Kevin Newland from his office v~,~ould be <br />meeting with the city to gather additional permit and fee information. Crai~g would like to <br />have Rick Williams attend. ACTION: Dave and Leonard will do additio~al permit and <br />fee research. Rick and Kevin will set a time to meet with the city. <br />Environmental <br />6-27 Randy is coordinating a meeting to discuss only environmental issues. Th~ meeting has <br />been set for 7/3 at 2:00 in the Board of Commissioner's meeting room. Ra~dy is <br />assembling the list of desired attendees. Rev. 7-3 The meeting was resdheduled for 7- <br />9. Development team members to attend: Randy, RG, Kathleen, Bill, Dar~I and Craig. <br />7-3 The group discussed approaches for removing contaminated soils. Remov~ prior to mass <br />excavation or as a part of. Pence / Kelly has no money in the budget for haluling or <br />treating contaminated soil. Randy was concerned about slowdown in proje~ct in order to <br />deal with soil. ACTION: Kathleen will attempt to quantify dollars involv~ed with <br />removing contaminated dirt. Dave will attempt to quantify schedule impadts. <br />Dewatering <br />6-27 Tom Gainer with Century West (environmental) is coordinating the drill te~t with <br />~ Geotechnical Resources, Inc. The well was to be drilled 6-27. GRI postpqned due to a <br />
The URL can be used to link to this page
Your browser does not support the video tag.