Laserfiche WebLink
°~...r <br />•~./' <br />Furnish a copy of the permit to the Engineer. The permit shall <br />be so phrased as to absolve the County from any and all <br />responsibility in connection with the placing of material on said <br />property. <br />Request for Contractor's Rate <br />A copy of the Contractor's Rates shall be included with the bid <br />schedule. <br />Due to the nature of the investigative work which is difficult to <br />define, Marion County may negotiate time and materials rates for <br />some or all of the tasks based on the bid schedule submitted by <br />the contractor. The bid schedule to be completed by the <br />contractor for this proposal does not include all items listed in <br />Table 1 of the technical specifications or all potential pre- <br />construction activities. However, completion of the bid schedule <br />should be reflective of the initial scope of planned remedial <br />activities described in Table 1 of said specifications. <br />