Laserfiche WebLink
• <br />, <br />Total Third Floor Estimated Contractor Cost <br />Cost of Wak <br />General Conditions and Fee <br />Total Fourth Floor Estimated Contrador Cost <br />cost w work <br />Generei Conditions and Fee <br />Subtotal (Designe~ FiRh Fbor Estimated Contractor Cost <br />Remaining Tenant Improvement Ailowance <br />Total Fifth Floor Estimated Contractor Cost <br />SUBTOTAL (OVER) / UNDER•TENAN7 IMPROVEMENTS <br />ESTIMATING CONTINGENCY <br />INDEX TO CONSTRUCTION START <br />TOTAL(OVER)/UNDER-TENANTIMPROVEMENTS <br />• • <br />$ 1.106.602 S 622.960 S (483.642) S 646.847 S 628,840 S (18.00~ <br />$ 917,848 Included Below S 493.221 Included Below <br />g 108,123 Induded Below S <br />N 58.154 Included Below <br />$ 1.025,971 Z 622,9fi0 $ (403,011) S 551.375 S 627.860 S 76,485 <br />s 501,469 Included Below $ 434,976 Included Below <br />$ 59,074 Included Belaw $ <br />Y 51,287 Included Below <br />$ 560.543 S 527.950 S 486.263 S 643.245 <br />g 3pg,pq0 $ 306,040 S <br />r 199,500 S 199,500 <br />y~ 866.583 S 833,890 S <br />~~ (32.593) <br />~________ = 685,763 S 842.745 S <br />~= 156,982 <br />`y===='_ <br /> S (1,144,389) ; 451,351 <br /> S (413.024) S (149,211) <br /> $ (90.864) <br />----- S (17~106) <br />~=-=~x=te~oo <br /> sa <br />S sssf <br />r~ <br />(1,648,277) S 285,034 <br /> <br />vvtnaya' wa.~n.y v....q.....a..... ~..~ ...__"' <br />Overage - Tenant Improvements and Index <br />Total Overage Without Estimatinq Contingency <br />Cument Estimated Project Cost Contingency <br />Remaining Projeet Contingency Net of Estimating Contingency <br />$ (1.256,17~ <br />s (1,235,253) <br />S (2,491,430) <br />s 3,163,366 <br />scs=~=~sss= <br />$ 671,936 <br />S 434.245 <br />S (1,069,032) <br />s 3,163,366 <br />a=-o=ssaasa <br />$ 2,094,334 <br />Overage - Bul{ding Components With Index and Estimating Contingency S <br />S (2,537,400) <br />(1 <br />648 <br />27~ s <br />S (2.2~4~574) <br />285.034 <br />Under - Tenant Improvements Wkh Index a~d Estimating Contingency . <br />. ^ <br /> S (4.185.67~ S (1.989.540) <br />Current Estimated P-oJect Cost Contingency S 3,163,366 <br />-_~~~ _~_ S <br />__- 3,163,366 <br />~:~ ~ <br />Remaining Project Con6ngency Net of Estimating Contingency S (1.022,311) S 1,173,826 <br />