COR #59 8 $ 821.00 Added column ties $ 569 $ 25Z
<br />COR #61 8 $ 2,107.00 P,dded rebar on GF1 per shop drawings $ ~ qg~ $ 6~
<br />COR#62 8 $ 758.00 Luminarbaseatflagpole $ 526 $ 232
<br />COR #63 8 $ 2,310.00 Stand pipe changes per PR 7p ~ $ 1,602 $ 708
<br />COR#64 8 $ 40,678.00 Addedrebaratpourstrips $ 28,214 $ 12
<br />464
<br />CORlI65 6 $ (3,600.00) Delete7sandlayer $ ~Z,49~ $ ,
<br />~~ ~~~
<br />COR #66 8 $ 208,00 Added steel b2cing at canopy ~ $ ~~ $ ~
<br />COR #67 8 $ 9,245,00
<br />~ Change door frames per PR i131 ~ $ 6,412 $ 833
<br />2
<br />COR#68 8 $ ~ 553.00 Ownefsjobshackphone $ 384 $ ,
<br />~~
<br />COR #69 8 $ 116.00 Provide dowels at east stairvvell $ 80 $ 36
<br />COR #70 8 $ 371.00 Provide thickened generatw siab $ , 2S7 $ ~ 14
<br />COR #71 8 $ 2,201,00 Prwlde changes to air Intake $ ~ 5~ $ ~4
<br />COR #72 B $ (3,318.00) NTE eredR on removal of three tanks $ ~ 318~ $ _
<br />COR #73 8 $ 5,269.00 Provide changes to column base . $ 3,655 $ 1
<br />614
<br />COR #78 8 $ 964,00 Added dowels and shear head $ 669 $ ,
<br />295
<br />COR # 34 9 $ 7,607.00 Add (4) hot water hose bibs per PR #8 g q ~ ~ 5 $ ~ ~
<br />COR # 37 9 $ 31,336.00 Provide sump pit per PR #9 $ 27,735 $ 9
<br />601
<br />COR #75 9 $ (17,00) Provide revisions to eleetrieal drawings per PR #16 g ~12~ $ ,
<br />~~
<br />COR #76 9 $ 11,757,00 Provfde changes to alr at ruoms per, PR #27 y ~~g $ 3 47 y
<br />COR #82 9 $ 726.00 Provide Mro additiomdi 4" eondui[ sieeves in Data/COm room per PR # 29 $ gp4 g p2
<br />COR #83 9 $ 677.00 Provide two add@ional 1" conduits wkh pull crords per PR # 28 ~ $ 470 $ ZW
<br />COR #84 9 $ 8,960.00 Provide 273 3" conduit sleeves per EC proposal attemate # 32 $ 6,275 $ 2
<br />745
<br />COR #79 10 $ 82,520.00 Removal and disposai of unsuitable subgrade material $ 57,236 $ ,
<br />25
<br />264
<br />COR # 31 17 $ - Provide modifieations to pubifc works package per Cit~s requirements $ _ g ,
<br />_
<br />COR # 32 71 $ 4,607,00 ProNde access hatch and revisions to plumbir~q and sprinkler system $ 3,195 $ 7,412
<br />COR # 46 17 $ (20,759.00) Delete beMonke waterprooflng and reduce slab thicimess In same area $ (14,396) $ (6,361)
<br />COR # 49 11 $ 7,278.00 Provide insulffiion at rebar dowels and durometer bearing pad per RFI's 199 and 204 $ 5,048 $ 2,230
<br />COR #52 11 $ 2,934.00 Pravide dewatering for undocumented fiil areas from 527/99 to 6/20/99 $ Z,p3g g ggg
<br />COR #58 11 $ 1,407,00 Provide changes M gas pressure regulators per PR #21 ~ $ 976 $ 431
<br />COR #T/ 7 7 $ - Changes to elevator beems per PR ip4 y _ $
<br />COR #89 11 $ 387.00 Provide additional rebar at srouth slab step (gridline D) per structural engineer.site vis8 $ 268 $ 119
<br />COR #93 11 $ 855.00 Provide reinforeing at arcade slab per RFI 297 g ~ $ 2~
<br />COR #94 11 $ 2,794.00 Provide additional refnforcing and 6" hooks per submittal 2F1 and RFI 328 $ 1,938 $ 856
<br />COR #95 11 $ 5,558.00 Provide changes to nine columns per RFI 377
<br />' $ 3,855 $ 1,703
<br />COR #96 11 $ 405.00 Provide add
<br />Rional reinforoing for arcade bearns per RFI 379 g Zg~ $ ~24
<br />COR #99 11 $ 2,139.00 , Provide slab corttlnvaHon at holtom of east and west shafts per RFI 236 $ 1,484 $ 655
<br />COR #102 12 $ . 33,688.00. Removal and disposal of unsuitable subgrade material $ 23,366 $ 10,322
<br />COR #88 13 S 21,567.00 Removal and disposal of eontamfnated soiis-359.45 c.y. g p~,s~ $ _
<br />COR # 14 14 $ 1,362.00 Provide ducrivork and suppty tan revisions per PR #7 $ 945 $ 417
<br />COR #81 14 $ 4,607.00 Provide concrete ceiiing above srriteh gear and revise CMU walis per RFI 193 $ 3,195 $ 1,472
<br />COR #85 74 $ 4,686.00 Provide additionai contluit for swing gate operator per approved submittal 02710-001 $ 3,250 $ 1,436
<br />COR #87 14 $ 8T/.00 Provide short wail reinforoing at parking garage lobby per RFI 160 $ 608 $ 26g
<br />COR #100 14 $ 255.00 Provide changes to e~tit sigr~s per PR #42 g 177 g ~g
<br />COR #101 74 $ 654.00 Provide electripl power ta the tower elock per RFI 233 g q$q g 2~
<br />COR #103 14 $ 294.00 Provlde changes M bridge connecNon detail 9/56.1.1 per RFI 343 $ 204 $ .90
<br />COR #7 W 14 $ 475.00 ProWde additional PT cables and reinforeing ~ grid Ml10b ~ $ 329 $ 146
<br />COR #710 14 S 7,192.00 Provlde addmonal reinforcing ~ iloors 3, 4, 5 per structurel shop drawing review $ q,gSg g p~2p4