Laserfiche WebLink
~~~~0°o Courthouse Square <br /> Approved COR/ CO Log <br /> APPROVED - ~ <br />- COUNTY TRANSIT <br />COR CO AMOUNT DESCRIPTION OF CHANGE ALLOCATION qLLOCATION <br />COR # 1 1 $ 2,530.00 Decomission, removal and disposal of UST eneountered on &75~9 $ y g3p $ <br />COR # 2 7 $ 1,765.00 ResoNe gas fine conflicts during sewer line relocation ~ g ~~q $ ~y~ <br />COR # 4 1 $ 12,275.00 Remaval and disposal ot coMaminated soils-203.9 c.y. g ~Z Z~g $ _ <br />COR # 5 <br />~ 1 $ 4,98200 Decomission, removal and dsposal ot UST encountered along s, blocidaee g q ggp $ _ <br />COR <br /># 6 1 $ 3,450.00 increase compresshre shength of foaGng pads from 3,000 to 5,000 psi $ 2,393 $ 7 <br />057 <br />COR # 9 2 $ 16,112.00 Removal and disposal of wnqminated soils-268.54 c.y. $ ~ ~ g ~ ~ 2 $ , <br />COR # 12 2 S 685.00 DemolRlon of water vauR along Court street $ 475 $ 210 <br />COR # 17 2 $ 47,470.00 Removal and dlspasal of eontaminated soiis $ 41 <br />470 $ _ <br />COR # 20 3 $ 214,993.00 • Exeavation of unsultabie subgradeJfill in areas of unsuitable or contaminated soils $ , <br />759,414 $ 55 <br />579 <br />COR # 27 4 $ 27,697.00 Removal and disposal of contaminated soils-461.62 c.y. $ 2~ 6y~ $ , <br />COR # 3 5 $ 14,735.00 ~ Expvate, remove and dspose, of three tanks in the NW comer of the sRa $ 14,135 $ - <br />COR # 7 5 $ 6,966.00 Additionai dewatering wsts due to overexeavation <br />~ <br />- $ q gg2 $ Z ~ 34 <br />COR # 8 5 $ 1,876.00 Owners share of partnedng Sesslon <br />. $ y38 $ y3a <br />COR # 10 5 $ 1,394.00 Provide cavitywall Insulatlon at exterior masonrywalls o( rooms 1209 <br />1219 and 1239 g gg/ g 427 <br />COR # 73 5 $ (700.00) , <br />Delete sump pump at elevator#1 $ ~486~ $ ~Z~4~ <br />COR # 18 5 $ (18,723.00) VE proposal #1-Delete low "E" coating on #3 suRace of bus ma0 glass pnopy system $ (12,986) $ (5 <br />73~ <br />COR # 19 5 $ (7,744.00) VE proposal #7-Replace 1600 amp bus duct with eonduit and wire for feed to rooftop equip. $ (~,Z~ p) $ , <br />~53q~ <br />COR # Y1 5 $ 5,193.00 Provide couplers at top of parltlng level eolumns for future north pad development $ 3,602 $ 1 <br />591 <br />COR # 23 5 $ (440.00) Delete PT tendon loptors $ (305) $ , <br />(13y~ <br />COR # 26 5 $ 993.00 Revise column ties after fabrication $ 689 $ 304 <br />COR # 27 5 $ 538.00 Provide column ta7 revislons ~ $ 3~ $ . <br />~~ <br />COR # 29 5 $ 9,534.00 Revise column reinforcement delal $ 6,613 $ 2 <br />g27 <br />COR # 30 5 $ 2,T/5.00 Provide added rebar at isoiation joints $ 1,925 $ , <br />850 <br />COR # 33 5 $ (1,081.00) Delete link seal and ESP-0 $ .~ n~~ $ ~~~~ <br />COR # 35 5 $ 6,074.00 Revise columns to go to roof level at gdds O/11 and O/12 - $ 4,213 $ ~ 1 <br />861 <br />COR # 36 5 $ (2,547.00) Revise eolumn type at grid J-10a $ ~~ ~~ $ , <br />~0~ <br />COR # 38 5 $ 790.00 Provide relnforcing at SOG beneath columns $ 548 $ 242 <br />COR # 39 5 $ 2,053.00 Provide added footing and column . $ 1,424 $ 629 <br />COR # 42 5 $ (6,962.00) VE proposal #3-Revise preeast panels to mRered comers instead of "U" shape $ (6,276) $ (2,746) <br />COR # 44 5 $ - Provide flourescent lamp revisions $ _ $ <br />COR # 45 5. $ - Provide hollow metai T2me revisions ~ $ _ $ _ <br />COR # 47 S $ 963.00 Provide fioor hardener at rooms 7209, 1219, and 7239 $ 668 $ 295 <br />COR # 48 5 $ 105.00 Change wail mounted water eioset to floor mounted water closet in room 1724 $ 73 g 3Y <br />COR #50 5 $ 375.00 Remove and disposa of UST adjaceM to Church Street $ 315 $ _ <br />COR #53 5 $ 3,186.00 Revise foundation d21n pipe speefication . $ 2,210 $ 976 <br />COR#54 5 $ 1,270.00 <br />~ ProvideaddedrebarlorpilasterattheSWairshaft g g3g $ 3~~ <br />COR #56 5 $ (83.00) Provide changes to giazing g <br />~ <br />COR # 28 6 $ 32,437,00 Provide six parapel parldng stails w/ covered walkway -relocate future job trailers to Church $ ?2,498 $ 9,yg <br />COR #51 7 $ 90,846.00 " Excavation of unsuitable subgrade/fiil in areas of unsuitable or contaminated soils $ 67,965 $ 22,881 <br />COR # 24 8 $ 5,29200 Slab transition revisions <br />$ <br />3~~~ <br />$ <br />1,621 <br />COR #55 8 $ 23,550.00 Upgrade windows to Sungate 1000 at three buildin faces <br />9 $ 16,334 $ 7,216 <br />COR #57 8 $ 1,569.00 Change column in hearing room $ 1,088' $ 481 <br />