Laserfiche WebLink
Finance Team Meeting Summary <br />June 11, 1998 <br />Present: Billy Wasson, R.G. Andersen-Wyckoff, Tom Wolfgram, Elyn Lyon, Mike <br />Hansen, Craig Lewis, Dan Petrusich, Ra1ph Grim, Jeff Davis, Sheryl Derting. <br />Agenda: 1. Review status of remediation costs. <br />. Overall status of expense. <br />. Transit assumption of paying agent. <br />. Other business. <br />Review status of remediation costs. <br />Sheryl handed out copies of the most current overall CH2 budget, along with the review sheets <br />from Elyn Lyon and Dave Hartwig regarding the costs for remediation and demolition. It was <br />determined that the time has come to break the bills down individually between Transit and the <br />County for remediation, demolition and abatement. It was also noted that the three county <br />purchased properties should also be listed separately for accounting purposes. Billy stated that <br />Century West had given a presenta.tion eazlier and they were at approximately $512,000, which <br />includes FOSS, Transportation of soils and dumping costs. <br />Elyn will call a subcommittee meeting to review the bills. Their first meeting will be prior to <br />the ne~ Finance Team meeting. Members will include: Ra.ndy Curtis, R.G. Andersen-Wyckoff, <br />Elyn Lyon, and Tom Wolfgram. Management needs to define the cost breakdown assumptions <br />between Transit and the County, and the Century West representative will need to define any <br />billings that are uncleaz as to category. Mike Hansen stated we need to consider whether the <br />clean soil hauled away that would have had to be excavated anyway for the project would <br />partially fall under Transit paying assumptions. R.G. stated it would not. Mike said we need to <br />be very clear on what assumptions we are working under as we break down these bills. <br />There is still work pending. Century West needs to drill test holes for about $7,900, there will <br />be about $2,000 for Bazker to re-survey, and we still have DEQ review costs. Elyn will do work <br />orders for these as needed. R.G. stated that geotechnical soil testing for load bearing is a shared <br />expense (42%), but that soil testing for remediation is not shared. Dan wanted to make sure <br />Barker uses geotech software when they do their work so it can be easily used by Melvin Mazk. <br />Craig will contact Leona.rd Lodder to ensure this. <br />It was agreed that before any new contracts are issued that the percentage split between Transit <br />and the County be written on the contract, even if one party pays all. A copy of all contracts <br />need to be sent to Tom for the main file. <br />