My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interface Engineering- Site Visit Report
>
CS_Courthouse Square
>
Interface Engineering- Site Visit Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:04:04 AM
Creation date
8/15/2011 12:05:02 PM
Metadata
Fields
Template:
Building
RecordID
10245
Title
Interface Engineering- Site Visit Report
Company
Interface Engineering
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/18/2000 08:a8 FAX 50a 581 a655 ARBUCRLE COSTIC ~ BILLY ~ASSON C~004/004 <br />ITE <br />N~ ROOM NO./ <br />'LOCATION <br />R~~~'~ COMPLETE <br />D <br /> 4210 <br />58 Conference <br />4211 Installation not complete at this time. Y <br />59 Corridor 4241 EWC-1 not o eratin . X <br />60 L-1 fauceta not o eratin . Ad'ust as re uired. N <br />61 <br />Men 4243 Water closet/urinal i.nfrared sensors are not operating_ Fix <br />roblems. N <br />62 Provide 0.5 GPM aerator at lavato faucets. N <br />63 Missing WCO at water closet wall. N <br />64 Clean SS-1 to new condition_ Y <br />65 Janitor 424~ Fuush SS-1 installation. Y <br />66 South L-1 faucet not o Eratin~. Ad'ust as re uired. N <br />67 <br />Women 4264 Water closet infrared aensors are not operatin.g. Fix <br />roblems. N <br />68 WCO at L-1 not installed. N <br />69 Provide 0.5 GPM aerator at lavator fauceta. N <br />'TO <br />W <br />3 Provide 0.5 GPM aerator at lavator faucets. N <br />,~i omEn 51~1 ~avatory faucets c clin wilclly. Adjust to correct. Y <br />72 Women 5143 <br />cont. Fix WC infrared sensors. N <br />73 Break Room <br />5144 Complete plumbing system installation_ Y <br />74 Provide 0.5 GPM aerator at lavato f'aucets. N <br />75 Men 5153 Lavat~r faucets c clin wildly. Adjuat to cox7rect. Y <br />76 Fix WC & U infrared senaors_ N <br />77 Provide mechanical identification_ Y <br />7S Storage 5162 provide SOV at ET-2. N <br />79 Provide 0_5 GPM aerator at lavator faucets. N <br />80 Lavator faucets c clin wildl . Ad'ust to correct. Y <br />g~ Men 5243 Fix U and WC infrared senaora_ N <br />82 Provide WCO at WC. N <br />83 Provide mechanical identification. N <br />84 Move check valve u stream of ET-1. N <br />8b Janitor 5244 pi.a~de SOV at ET-1. N <br />86 Provide thermometers at WH-1 and P-1_ N <br />87 Provide 0.5 GPM aerator at lavator faucete. N <br />88 Women 5254 Lavator faucets c clin wildl _ A~ust to correct. Y <br />89 Fix WC infrared sensors. N <br /> <br />90 <br />Exterior Clean fini.sh on hose bibbs and downspout nozzle~. Acid or <br />gome chemical the masons use on brick has afFected $nish. <br />N <br />We are proceeding with the project based on the above statementa being correct_ Please notify <br />Interface Engineering, Inc. immediately if there are any corrections or additiona to this document. <br />M:\98'l8\Clerical\Obeervation Reposts~IV1+~ punch lists\p101700aite2.doc Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.