Laserfiche WebLink
10/18/2000 08:a8 FAX 50~ 581 ~655 ARBUCKLE COSTIC ~ BILLY WASSON (~00~/004 <br />IT~ <br />ND ROO1V~ NO.I <br />LOCATION <br />R~~R~ COIVIPLETE <br />D <br />22 Provide e ui ment identification for WH-2. N <br />23 Provide 4 KW element at WH-2. N <br />24 North L-1 o eratin~ wild_ At~just as re uired. Y <br />2~ <br />Men 2243 Water closet/uri.zLal infrared aenaors axe n~t operating. Fix <br />roblems. N <br />26 WCO at L-l, not installed. N <br />27 Provide 0_5 GPM aerator at lavato faucets. N <br />28 Men 2243 <br />(cont. ~ssing WCO at water closet wall. N <br />29 ~Tanitor 2244 Clean SS-1 to new condition. N <br />30 Water closet infrared sensors are not operating. Fix <br />problems. N <br />31 Women 2254 Ad'ust faucets to turn off withi,z~ 2 seconds of hand removal. N <br />32 Provide 0.5 GPM aerator at lavato faucets_ N <br />33 WCO at L-1 not installed. N <br />3~ Breakroom Provide 6 KW element at WH-6. N <br />35 2295 Provide e ui ment identification for WH-6. N <br />36 Sitnk su lies turned O~F. Y <br />37 Breakroom <br />32 Install W~i-8. Y <br /> <br />38 20 <br />Provide dishwasher rou h-in. <br />Y <br />39 South L-lfaucet not o eratin . Ac~just as re uired_ Y <br />40 Water cloaet/urinal infrared senaora are not operating. Fix <br />roblems. N. <br />41 Men 32~3 WCO at L-1 not installed. N <br />42 Provide 0.5 GPM aerator at lavatox faucets. N <br />43 Miesin Vi~CO at water closet wall. N <br />44 Janitor 3244 Clean SS-1 to new conditi.on. Y <br />45 South L-1 faucet not o eratin . Ad'ust as re uired. Y <br />46 <br />W Water closet inf'rared sensoxs are not operating. Fix <br />roblems. N <br />47 omen 3254 WCO at L-1 not installed. N <br />~a Provide 0.5 GPM aerator at lavatory faucets_ Tighten <br />faucete. N <br />49 South L-1 faucet o eratin wild_ Ad~ust as re uired. N <br />50 North L-1 faucet not o eratin . A'ust as re ui.red_ N <br />51 Women 4133 Water closet infrared e~ensors aze not opexating. Fix <br />xoblems. N <br />52 Provide 0.5 GPM aerator at lavato faucets. N <br />53 North L-1 faucet not o eratin . Adjust as re uired. N <br />54 <br />Men 4134 Water closet/urinal infrared sensors are not operatiur~g. Fix <br />roblems_ N <br />55 WCO at L-1 not installed. N <br />56 Provide 0.5 GPM aerator at lavator faucets_ N <br />57 Breakroom Finish water heater installation. N <br />1~Ve are proceeding with the project based on the above statementa being correct. Please notify <br />Interface Engineering, Inc. immediately if there are any corxections or additions to this document_ <br />M:\9828\Clerical\Observation Reports\M+~ punch lists\p101700site2.doc Page 2 of 3 <br />