Laserfiche WebLink
Salem Area Mass Transit District/Marion County IFB 00-03 11 <br />TAB Services <br />SPECIFICATIONS <br />TESTING, ADJUSTING AND BALANCING <br />2) SCOPE OF WORK <br />2) SUMMARY <br />ATTACHMENT IV <br />Work included: Materials, equipment and labor required for testing,adjusting, and <br />balancing work required by this Section, including air, plumbing, and associated <br />equipment and apparatus. <br />2) QUALITY ASSURANCE <br />Codes and Standards: <br />NEBB Compliance: Comply with NEBB's "Procedural Standards for Testing, <br />Adjusting, and Balancing of Environmental Systems" as applicable to mechanical air <br />and hydronic distributions systems, and associated equipment and apparatus; or <br />comply with AABC's Manual MN-1, "AABC Nation Standards," as applicable to <br />mechanical air and hydronic distribution systems, and associated equipment and <br />apparatus. <br />• Industry Standards: Comply with ASHRAE recommendations pertaining to <br />measurements, instruments, and testing, adjusting and balancing, except as <br />otherwise indicated. <br />2) SUBMITfALS <br />Procedures: Submit certified test reports, signed by Test and Balance (TAB) supervisor <br />who performed TAB work. <br />Report Forms: <br />• 8-1/2 by 11 inch paper for loose-leaf binding, with blanks for listing of the required test <br />ratings and for certification of report. <br />• Reports on forms similar in content to standard AABC of NEBB test forms. <br />• Submit final test and balance report. Include Record Drawings with terminal codes for <br />cross-reference with the Submittal, such that terminals referenced in the Submittal <br />are easily ~ocated on the Drawings. <br />• Include identification and types of instruments used, and their most recent calibration <br />date. <br />Maintenance Data: Include in maintenance manuals, copies of balancing report and <br />identification of instruments. <br />