My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interface Engineering- Misc. Documents
>
CS_Courthouse Square
>
Interface Engineering- Misc. Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:03:40 AM
Creation date
8/15/2011 11:56:07 AM
Metadata
Fields
Template:
Building
RecordID
10244
Title
Interface Engineering- Misc. Documents
Company
Interface Engineering
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Design - Planning
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Salem Area Mass Transit District/Marion County IFB 00-03 11 <br />TAB Services <br />SPECIFICATIONS <br />TESTING, ADJUSTING AND BALANCING <br />2) SCOPE OF WORK <br />2) SUMMARY <br />ATTACHMENT IV <br />Work included: Materials, equipment and labor required for testing,adjusting, and <br />balancing work required by this Section, including air, plumbing, and associated <br />equipment and apparatus. <br />2) QUALITY ASSURANCE <br />Codes and Standards: <br />NEBB Compliance: Comply with NEBB's "Procedural Standards for Testing, <br />Adjusting, and Balancing of Environmental Systems" as applicable to mechanical air <br />and hydronic distributions systems, and associated equipment and apparatus; or <br />comply with AABC's Manual MN-1, "AABC Nation Standards," as applicable to <br />mechanical air and hydronic distribution systems, and associated equipment and <br />apparatus. <br />• Industry Standards: Comply with ASHRAE recommendations pertaining to <br />measurements, instruments, and testing, adjusting and balancing, except as <br />otherwise indicated. <br />2) SUBMITfALS <br />Procedures: Submit certified test reports, signed by Test and Balance (TAB) supervisor <br />who performed TAB work. <br />Report Forms: <br />• 8-1/2 by 11 inch paper for loose-leaf binding, with blanks for listing of the required test <br />ratings and for certification of report. <br />• Reports on forms similar in content to standard AABC of NEBB test forms. <br />• Submit final test and balance report. Include Record Drawings with terminal codes for <br />cross-reference with the Submittal, such that terminals referenced in the Submittal <br />are easily ~ocated on the Drawings. <br />• Include identification and types of instruments used, and their most recent calibration <br />date. <br />Maintenance Data: Include in maintenance manuals, copies of balancing report and <br />identification of instruments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.