My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition Correspondence
>
CS_Courthouse Square
>
Demolition Correspondence
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:20:52 PM
Creation date
8/10/2011 12:23:51 PM
Metadata
Fields
Template:
Building
RecordID
10112
Title
Demolition Correspondence
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SALEM COURTHOUSE SQUARE INC. <br />SECTION 00100 <br />DEMOLTTION INVITATION/PROPOSAL <br />1997 PAGE 1 OF 2 <br />SALEM COURTHOUSE SQUARE INC. <br />DEMOLITION/SALVAGE/RECYCLING AND SITE CLEARANCE <br />1997 <br />NOTICE TO CONTRACTORS: <br />Contractors licensed to perform demolition, salvage, recycling and site clearance in the State of Oregon are <br />invited to submit proposals for upcoming work at the all structures bounded by Court Street, Church Street, <br />Chemeketa and High Street in Sa1em, Oregon. <br />Any reference to bid(s) in these documents is a standazd term and means proposal. <br />DESCRIPTION OF WORK: <br />This project involves the Demolition of all structures bounded by Court Street, Church Street, Chemeketa Street <br />and High Street in Salem, Oregon. This Proposal shall be a single fixed price. The demolition includes but is not <br />necessarily limited to the following: Demolition of Buildings, Concrete Slabs Asphalt and Paving, foundations to <br />subgrade and Salvage of required components. The Proposal shall include lateral force resisting structural <br />components to shore the subgrade basement sa11 to the floors that are to remain. <br />TIME SCHEDULE: <br />It is the owners goal that the project be completed by June 30, 1997. <br />PROPOSAL DOCUMENTS: <br />The Proposals (Proposal Pages and Project Specifications) will be distributed at the mandatory walk-through on <br />March 17, 1997. Additional copies may be obtained from: <br />Marion County Risk Management <br />100 High St. NE <br />Salem, Oregon 97301 <br />phone # (503) 588-5294 <br />
The URL can be used to link to this page
Your browser does not support the video tag.