Laserfiche WebLink
SALEM COURTHOUSE SQUARE <br />DEMOLITION <br />1997 <br />load-bearing conditions. <br />SECTION 01010 <br />SCOPE OF WORK <br />PAGE 5 OF 8 <br />C. Sidewalk and Walkway: For safe passage of persons along the walkway. Coordinate with project <br />entrance gates and other facilities. Comply with governing regulations and requests of governing <br />authorities. <br />1. Sidewalk: Heavy scaffold or shoring type framing, waterproofed heavy wood plank overhead <br />decking, protective plywood enclosure walls, handrails, barricades, warning signs, lights, safe <br />and well-drained walkways and similar protection for safe passage. <br />D. At Contractor's own expense, Contractor shall immediately restore to service and repair any <br />damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of <br />utility services or of fire protection systems and commumcation systems (including telephone) <br />which are not scheduled for discontinuance or abandonment. <br />1.10 CLEAN-UP <br />A. On completion of work of this section and after removal of all debris, leave site in clean condition <br />satisfactory to the Owner or Owner's Representative. Dispose of a11 items and materials not <br />required to remain property of Marion County as well as all debris and rubbish from demolition <br />operations. <br />END OF SECTION <br />