~Courthouse Square ~
<br />Court ~ High Street
<br />Sabm, Orepm ~
<br />Arbuckb Castic ArchRects, Inc ,
<br />~50% Contrad Documents Estimate '
<br />_--- - - i - - _ -
<br />Component
<br />- - - - _ -- Area
<br />-- - ~- --
<br />Building Shell 8 Core 152,792 sf
<br />Parking 71.979 sf
<br />Bus Mall 66,528 sf
<br />Street Scape 35,650 sf
<br />Tenant Finishes
<br />County
<br />Transit
<br />Solid Waste
<br />Conferencs Center
<br />85,725 sf
<br />17,784 sf
<br />5,866 sf
<br />4,951 sf
<br />cost / sf
<br />Building Shell 3 Core
<br />Parking
<br />Bus Mall
<br />Street Scape
<br />County
<br />Tronsit
<br />Solid Waste
<br />Conference Center
<br />ALTERNATES
<br />_ - ---- __ - -
<br />1 Parking Altemate 1
<br />2 Parking Altemate 2
<br />30
<br />40
<br />_ _. _ _ ._ _ __ - - ------- . . __ _ __ __
<br />Architectural Cost Consuitant~, LLC _
<br />en~„~ce oa~e
<br />R o~-oeo-9e :
<br />James A. Jerde, AIA - Stanby J. Pazczolkowski, AIA Oounnent Date: 29•Od-9p
<br />6441 SW Cenyon CaM, SuRe 103 PriM Date: 03Dea98
<br />Portland, Orepon 97221 PriM Time. 11:07 MA
<br />Phone (503) 297-7210 Fax (503) 297-7187
<br />-- - Constniction StaA
<br />
<br />-- _ ----- Spnnp 99 _
<br />--- _ _ _ ----- ----- ---_ _ _-
<br />DIRECT CONSTRUCTION COST - PARTNERS SUMMARY
<br />
<br />----- - -
<br />Bldg S 3 C
<br />-~ - - -----
<br />Conference Ctr.
<br />-- -- -- -
<br />County
<br />~~
<br />Solid Waste
<br />-~ -
<br />Transit
<br />- --- -
<br />Parking
<br />Bus Mail -
<br />Streetscape
<br />---
<br />Totals
<br />-
<br />Comments
<br />---- - .. _----
<br />11,308,712
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />374.01
<br />S11,308,712
<br />52,416,574
<br />S2,175,371
<br />S1,789,777
<br />52,279,366
<br />51,176,455
<br />S148,190
<br />S278,264
<br />521,572,709
<br />- - -- - ---_ _ Bidg S ~ C _ Confe
<br />22,092 sf 0
<br />19,467 sf 0
<br />sf
<br />sf i
<br />0 25,989 0 25,989 0 0 0 511,360,691
<br />0 457,677 0 457,677 2,416,574 0 0 53,331,929
<br />0 0 0 0 0 2,175,371 0 52,175,371
<br />0 0 0 0 0 0 1,789,777 51,789,777
<br />0 1,795,699 0 0 0 0 0 S1,T95,699
<br />0 0 0 692,788 0 0 0 S692,788
<br />0 0 148,190 0 0 0 0 S148.190
<br />278,264 0 0 0 0 0 0 S278,264
<br />278,264 2,279,366 148,190 1,176,455 2,416,574 2,175,371 1,789,777 521,572,709
<br />556.20 $26.59 $25.26 $66.15 E33.57 $32.70 $50.20
<br />rence Ctr. Coun _ Solid Waste Tronait Parkln9__ Bus Mall Streetscape _ Totals___
<br />0 6,488 0 6,48$ 975,295 0 0 5988,271
<br />0 0 0 0 849,921 0 0 f849,921
<br />0
<br />I 0
<br />The above estimates are for direct construction cost only. They do not include fumishings 8 equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and
<br />removal, financing costs, nor any other normally associated development costs.
<br />The above estimates assume a competitively bid project, with at least three qualified bidders in each oi the major sub-trades as well as the general contractors. All work to be contracted at one time
<br />(shell b core, street 8 bus mall and tenant improvements). If project is to be phased, additional cost associated with phasing to be added.
<br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed beyond this date, the estimates must be indexed at a rate of 2 to 4% per year compounded.