Laserfiche WebLink
~Courthouse Square ~ <br />Court ~ High Street <br />Sabm, Orepm ~ <br />Arbuckb Castic ArchRects, Inc , <br />~50% Contrad Documents Estimate ' <br />_--- - - i - - _ - <br />Component <br />- - - - _ -- Area <br />-- - ~- -- <br />Building Shell 8 Core 152,792 sf <br />Parking 71.979 sf <br />Bus Mall 66,528 sf <br />Street Scape 35,650 sf <br />Tenant Finishes <br />County <br />Transit <br />Solid Waste <br />Conferencs Center <br />85,725 sf <br />17,784 sf <br />5,866 sf <br />4,951 sf <br />cost / sf <br />Building Shell 3 Core <br />Parking <br />Bus Mall <br />Street Scape <br />County <br />Tronsit <br />Solid Waste <br />Conference Center <br />ALTERNATES <br />_ - ---- __ - - <br />1 Parking Altemate 1 <br />2 Parking Altemate 2 <br />30 <br />40 <br />_ _. _ _ ._ _ __ - - ------- . . __ _ __ __ <br />Architectural Cost Consuitant~, LLC _ <br />en~„~ce oa~e <br />R o~-oeo-9e : <br />James A. Jerde, AIA - Stanby J. Pazczolkowski, AIA Oounnent Date: 29•Od-9p <br />6441 SW Cenyon CaM, SuRe 103 PriM Date: 03Dea98 <br />Portland, Orepon 97221 PriM Time. 11:07 MA <br />Phone (503) 297-7210 Fax (503) 297-7187 <br />-- - Constniction StaA <br /> <br />-- _ ----- Spnnp 99 _ <br />--- _ _ _ ----- ----- ---_ _ _- <br />DIRECT CONSTRUCTION COST - PARTNERS SUMMARY <br /> <br />----- - - <br />Bldg S 3 C <br />-~ - - ----- <br />Conference Ctr. <br />-- -- -- - <br />County <br />~~ <br />Solid Waste <br />-~ - <br />Transit <br />- --- - <br />Parking <br />Bus Mail - <br />Streetscape <br />--- <br />Totals <br />- <br />Comments <br />---- - .. _---- <br />11,308,712 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />374.01 <br />S11,308,712 <br />52,416,574 <br />S2,175,371 <br />S1,789,777 <br />52,279,366 <br />51,176,455 <br />S148,190 <br />S278,264 <br />521,572,709 <br />- - -- - ---_ _ Bidg S ~ C _ Confe <br />22,092 sf 0 <br />19,467 sf 0 <br />sf <br />sf i <br />0 25,989 0 25,989 0 0 0 511,360,691 <br />0 457,677 0 457,677 2,416,574 0 0 53,331,929 <br />0 0 0 0 0 2,175,371 0 52,175,371 <br />0 0 0 0 0 0 1,789,777 51,789,777 <br />0 1,795,699 0 0 0 0 0 S1,T95,699 <br />0 0 0 692,788 0 0 0 S692,788 <br />0 0 148,190 0 0 0 0 S148.190 <br />278,264 0 0 0 0 0 0 S278,264 <br />278,264 2,279,366 148,190 1,176,455 2,416,574 2,175,371 1,789,777 521,572,709 <br />556.20 $26.59 $25.26 $66.15 E33.57 $32.70 $50.20 <br />rence Ctr. Coun _ Solid Waste Tronait Parkln9__ Bus Mall Streetscape _ Totals___ <br />0 6,488 0 6,48$ 975,295 0 0 5988,271 <br />0 0 0 0 849,921 0 0 f849,921 <br />0 <br />I 0 <br />The above estimates are for direct construction cost only. They do not include fumishings 8 equipment, consultant fees, inspection and testing fees, plan check fees, hazardous material testing and <br />removal, financing costs, nor any other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each oi the major sub-trades as well as the general contractors. All work to be contracted at one time <br />(shell b core, street 8 bus mall and tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed beyond this date, the estimates must be indexed at a rate of 2 to 4% per year compounded. <br />Partner Summary <br />