Laserfiche WebLink
Ct~urthe.~se Square <br />Court & High Street <br />Salem, Oregon <br />,Arbuckle Costic Architects, Inc <br />~~noi c.,.,rr~et I~nr~~ments Estimate <br />Architectural Cost Consultants, LLC <br />James A. Jerde, AIA - Stanley J. Pszczolkowski, AIA <br />6441 SW Canyon Court, Suite 103 <br />Portland, Oregon 97221 <br />Phone (503)297-7210 Fax (503)297-7187 <br />Estimate Date: R 03-Dec-98 <br />Document Date: 29-Oct-98 <br />Print Date: 03-Dec-98 ~ <br />i Print Time: 11:07 AM <br />j Construction Start: Spring 99 __ <br />DIRECT CONSTRUCTION COST SUMMARY <br />Comnonent <br />Area $/ SF <br />Cost <br />, Building Shell & Core <br />Parking <br />~ Bus Mall <br />Subtotal <br />Streetscape <br />Subtotal <br />Tenant Finishes <br />' Ground Level Tenant Finishes <br />Second Floor Tenant Finishes <br />Third Floor Tenant Finishes <br />Fourth Floor Tenant Finishes <br />Fifth Floor Tenant Finishes <br />152,792 sf <br />71,979 sf <br />66,528 sf <br />224,771 sf <br />35,650 sf <br />35,650 Sf <br />13,916 sf <br />27,462 sf <br />28,062 sf <br />28,062 sf <br />16,824 sf <br />114,326 sf <br />74.35 11,360,691 ~ <br />46.29 3,331,929 ~I <br />32.70 2,175,371 I; <br />I <br />75.05 $16,867,991 , <br />50.20 1,789,777 <br />50.20 $1,789,777 <br />53.04 738,116 <br />29.79 818,119 <br />17.19 482,342 <br />15.69 440,414 <br />25.91 435,949 <br />25.50 $2,914,941 I <br />Comments <br />TOTAL DIRECT CONSTRUCTION COST 521,572,708 ~ <br />~ <br />Budget ~ ~~ <br />~ <br />21,572,708) i <br />Indicated Surplus / (Deficit) ~ <br />• I~ <br />ALTERNATES <br />1 Parking Altemate 1 22,092 sf 44.73 Add t 988,271 i <br />2 Parking Attemate 2 19,467 sf 43.66 Add t 849,921 <br />' 3 0 ~ <br />40 ~ <br />--1 <br />The above estimates are for direct construction cost only. They do not include fumishings & equipment, consultant <br />fees, inspection and testing fees, plan check fees, hazardous material testing and removal, financing costs, nor any <br />other normally associated development costs. <br />The above estimates assume a competitively bid project, with at least three qualified bidders in each of the major <br />sub-trades as well as the general contractors. All work to be contracted at one time (shell & core, street & bus mall and <br />tenant improvements). If project is to be phased, additional cost associated with phasing to be added. <br />The estimate includes a 1.5% estimating contingency. (drawings and details are not complete, complete specifications <br />not provided for this estimate). <br />The above estimates assume a construction start date of: Spring 99 If the start of construction is delayed <br />beyond the date above, the estimates must be indexed at a rate of 2 to 4% per year compounded. <br />Summary - Page 1 <br />