My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CE/KELLY Meeting Minutes <br />JCTION, INC. NO. $4 <br />~ ae~r~.,ca~ooia~.n <br />Project Manager. Dave Hays <br />a~•~~ CLO 10/11/00 ArbuCkle CostlC ArChibeCts ~ <br /> We need approval for the Damper (14 Dampers) COR's in the fan rooms and the stairs. These items have a <br />lead time. <br />10/25/00 - COR has been verbally approved. These will arrive week of 11h3 <br />G80.02 OLD 10/11/00 ArbuCkle CostlC ArChiteCts ~~ <br /> The electrical rooms heat up too much. <br />G82.01 OLD 10/Z5/00 O on Cascade Plumbin & Heatin DV <br /> Tuilet Sensors need to be adjusted. <br />11/1/00 - Sensors instailed today <br />11/8/00 - Is the water presure to great to sinks? Toilets? <br />H~•~ OLD 4H4/99 Pence/Kell Construction, Inc. ~~ <br /> ELECTRICAL CONCERNS <br />H81.01 CLO 10H8/00 Arbuckle Costic Architects ~~ <br /> Bob McCune has raised concems with the Daylight Harvesting Light Control System <br />H83.01 OLD ~ 11H/00 Pence/Kel Construction, lnc. JG <br /> Streetscape TransfoRners are on order. P/K will get ETA. <br />11/9/00 - How many transfonners? Craig L. says 6. LL says every pole. <br />~•~ OLD 4/14/99 Pence/Kell Construction, inc. JG <br /> SUBMITTAL REVIEW <br />~~•~ NEW 11/8/00 Pence/Kell Construction, inc. JG <br /> CLOSEOUT <br />~~•01 OLD 11H/00 ArbuCkle CoStiC ArChiteCts LL <br /> ~L will check with Oliver for compieteness of commissioning process. <br />~•01 NEW 11/8/00 • Electrical Construction Compan pBS <br /> Electrical As Builts are beign redone by ECC <br />184.02 NEW 11/8/00 Arbuckle Costic Architec'ts LL <br /> Electrical and Mechanicai OSM's are being reviewed by A/C <br />184.03 NEW 11/8/00 ArbuCkle CostiC ArChiteCts LL <br /> Mechanical, Underground, and Firesprinkler As-bults are under review by A.C <br />~~•04 NEW 11/8/00 Pence/Kel Construction~ Inc. JG <br /> General 08~M manual will be tumed over for review by 11h6 with index of manuals and required warrenties <br />184.05 NEW 11I8/00 Pence/Kell Construction~ Inc. JG <br /> Prefunctional Checklist - Complete by Trane, will be reviewed by P/K before tumover. Expect by 11/16 <br />~•~ NEW 11/8/00 Pence/Kel Construction~ Inc. JG <br /> Tumover Items. List complete. P/K stiil owes 1 change of filters, and stock of paint. Expect by 11/16 <br />184.07 NEW Pence/Kell Construction, Inc. JG <br /> GC Lein Waver forms are under work by P/K. Expect by 11/16 <br />•~•~ OLD 4/14J99 Pence/Kell Construction, inc. JG <br /> RFI REVIEW <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.