Laserfiche WebLink
CE/KELLY <br />ucrwN, iNC. <br />~..~.~.~,. ~~.~ ~,~..~ <br />~.~+lsoa~ ruaw+ Fvt (60S) 6Y6-747~ <br />oos. aas <br />Meeting Minutes <br />No. 84 <br />Project Manager: Dave Hays <br />Courthouse Square MEETING DATE: 11/8/00 <br />LOCATION• Arbuckle Costic SUBJECT: Construction Meeting <br />.. <br /> <br />Y <br /> <br />BW <br />. <br />Bill Wasson <br />~ .. . <br />Marion Coun <br />Y BMC Bob McCune Marion Coun <br />Y BC B ron Courts Melvin Ma~1c Com anies <br />Y CL Crai Lewis Melvin Mark Com nies <br />Y DH Dave Ha s Pence/Kell Construction Inc. <br />Y JH Jeff Hamm Salem Area Trensit <br />Y JG John Gremmels Pence/Kell ConsVuction, Inc. <br />Y JW John Wtidtin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckie Costic Architects <br />Y O Oliver Raab P.E. Interfaoe En ineerin Inc. <br />Y RC Rand Curtis Marion Coun <br />Y SS Steve Schaad Pence/Kell Construction Inc. <br />N TT Tim Terich Centu West En ineerin <br />A00.00 OLD 4/14/99 Pence/Kell Construction~ Inc. JG <br />PERMIT STATUS <br />800.00 OLD 4H4/99 Pence/iCell Construction, Inc. JG <br />SCHEDULE REVIEW <br />D00.00 OLD 4/14/99 Pence/Keli Construction~ Inc. JG <br /> CIVIL CONCERNS <br />E00.00 OLD 4J14/99 Pence/Kell Construction, Inc. JG <br /> STRUCTURALCONCERNS <br />F00.00 OLD 4N4/98 Pence/Kell Construction, Inc. JG <br /> ARCHITECTURAL CONCERNS <br />F74.02 CLO 8/30/00 ArbuCkle COStiC ArChiteCts LL <br /> LL to issue more info on the tactile map for the kiosks. will be outside of contract • <br />F83.01 CLO 11/1/00 PenceiKeli Construction~ inc. JG <br /> P/K will proceed with replacement of the Transit Columns pe~ COR 370. The Forrnica Laminate will be used <br />at an additional cost of $1080. The Columns wiil be installed 11/6. <br />F83.02 OLD 11/1100 PencelKell Construction, Inc. JG <br /> Signage: <br />- Plaques: Enamel Wash didn't woric. <br />- Kiosk frame's painting was rejected, will be installed today. <br />- Interior Signs will ship Friday. <br />- PR #165 needs approval. Can signs be cut off and pavered over? Can pavers be core driiled? <br />F84.01 NEW 11/8/00 ArbuCkle CostiC ArChiteCts LL <br /> LL to evaluate streetscape medallions. Include in punch list if necessary <br />G00.00 OLD U14/99 Pence/Kell Construction~ inc. JG <br /> MECHANICAL CONCERNS <br />Page 1 of 3 <br />