Laserfiche WebLink
PENCE/KELLY <br />CONSTRUCTION, INC. <br />7747 Mr~ Loop SE, Ed~m, ORl7301 (609) 989-7~23 <br />Portl~nd (Q08) 2ua66'1 Fu (60!) 686-7477 <br />«~..~ <br />Meetin~ Minutes <br />N~. =Z <br />Pr~ject Manaser: Dave Hays <br /> ~ . . ~ . .. ~ :• • <br />G80.02 OLD 10/11/00 Arbuckle Costic Architects LL <br /> The electrical rooms heat up too much. LL to issue a PR. <br />G82.01 NEW 10/25/00 Ore on Cascade Plumbin 8 Heatin DV <br /> Toilet Sensors need to be adjusted <br />G82.01 NEW 10/25/00 Pence/Kell Construction, Inc. JG <br /> P/K will organize a meeting to complete pre-functional check list per spec <br />H00.00 OLD 4/14/99 Pence/Kell Construction, Inc. JG <br />ELECTRICAL CONCERNS <br />H81.01 OLD 10/18/00 Arbuckls Costic Architects LL <br />Bob McCune has raised concerns with the Daylight Harvesting Light Control System <br />100.00 OLD 4/14199 Pence/Kell Construction, Inc. JG <br />SUBMITTAL REVIEW <br />J00.00 OLD 4H4/99 Pence/Keil Construction, Inc. JG <br />RFI REVIEW <br />J00.01 OLD 4HM99 Pence/Kell Construction, Inc. JG <br />Please see the Outstanding RFI Log <br />K00.00 OLD 4114199 Pence/Kell Construction, Inc. JG <br />ISSUE 8~ VE REVIEW <br />L00.00 OLD 11/11/99 Pence/Kell Construction, Inc. JG <br />MISCELLANEOUS <br />M00.00 OLD 4/23/99 Pence/Kell Construction, Inc. JG <br />PARTNERING <br />Prepared By: Pence/Kelly Construction, Inc. <br />Signed: Dated: 10/25/00 <br />John Gremmels <br />Page 2 of 2 <br />