My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Meetings Contractors
>
CS_Courthouse Square
>
Meetings Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:02:33 PM
Creation date
8/3/2011 3:31:48 PM
Metadata
Fields
Template:
Building
RecordID
10091
Title
Meetings Contractors
Company
Pence/Kelly Construction INC
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Project Coordination
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PEN~/KELLY <br />s~t~ w~c. ~.ooP s~, s+am. oFe o~3ox ~sos~ ssa-rns <br />Porl{rM (605) Y?Ai6B1 ~ Fax (603) 585-7477 <br />~...~ <br />Meeting Minutes <br />No. s2 <br />Project Manager: Dave Hays <br />Courthouse Square MEETING DATE: 10/19/00 <br />LOCATION: Arbuckle Costic SUBJECT: Construction Meeting <br />r, <br />~ <br />Y <br />. <br />BW <br />. ~ . <br />Bill Wasson <br />~ •. . <br />Marion Coun <br />Y BMC Bob McCune Marion Coun <br />Y BC B ron Courts Melvin Mark Com anies <br />Y CL Crai Lewis Melvin Mark Com anies <br />Y DH Dave Ha s Pence/Kell Construction, Inc. <br />N JH Jeff Hamm Salem Area Transit <br />Y JG John Gremmels Pence/Kell Construction Inc. <br />Y JW John Whittin ton Salem Area Transit <br />Y LL Leonard Lodder Arbuckle Costic Architects <br />N O Oliver Raab P.E. Interface En ineerin Inc. <br />N RC Rand Curtis Marion Coun <br />Y SS Steve Schaad Pence/Kell Constniction Inc. <br />N TT Tim Terich Centu West En ineerin <br />A00.00 OLD 4114199 Pence/Kel) Construction, Inc. JG <br />PERMIT STATUS <br />800.00 OLD 4114199 Pence/Kell Construction, Inc. JG <br />SCHEDULE REVIEW <br />879.01 CLO 10/4100 Arbuckle Costic Architects LL <br />Substantial Completion was 27 Septemeber. LL to issue letter. <br />D00.00 OLD 4/14199 Pence/Kelly Construction, Inc. JG <br />CIVIL CONCERNS <br />E00.00 OLD 4114/99 Pence/Kell Construction, Inc. JG <br />STRUCTURALCONCERNS <br />F00.00 OLD 4h4199 Pence/Kell Construction, (nc. JG <br />ARCHITECTURALCONCERNS <br />F74.02 OLD 8/30/00 Arbuckle Costic Architects LL <br />LL to issue more info on the tactile map for the kiosks. Possible upcharge if maps/frames are out of <br />character with rest of kiosks. <br />F80.02 OLD 10/11/00 Pence/Kell Construction, (nc. JG <br />The tile in the elevator floors was specified at 3/8" and the cab was built that way. The tile does not come in <br />3/8". There are cost to alter the cabs. <br />F81.01 CLO 10118/00 Arbuckle Costic Architects ~L <br />Is a curb cut required for the crosswalk per PR 158? <br />10/19/00 - No per LL <br />G00.00 OLD 4/14/99 Pence/Kel) Construction, Inc. JG <br />MECHANICAL CONCERNS <br />G80.01 OLD 10/11/00 Arbuckle Costic Architects LL <br />We need approval for the Damper (14 Dampers) COR's in the fan rooms and the stairs. These items have a <br />lead time. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.