My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specs: Water Spec/ Supplementary
>
CS_Courthouse Square
>
Bid Specs: Water Spec/ Supplementary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2012 7:23:02 AM
Creation date
8/1/2011 11:58:56 AM
Metadata
Fields
Template:
Building
RecordID
10053
Title
Bid Specs: Water Spec/ Supplementary
Company
Arbuckle/Costic
BLDG Date
1/1/1999
Building
Courthouse Square
BLDG Document Type
Procurement
Project ID
CS9801 Courthouse Square Construction
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
destination of materials. <br />WASTE MANAGEMENT PLAN IMPLEMENTATION <br />A. Manager: The Contractor shall designate an on-site <br />party (or parties) responsible for instructing <br />workers and overseeing and documenting <br />results of the Waste Management Plan for the <br />Project. <br />[DEPENDING ON TEiE SIZE AND COMPLEXITY OF THE <br />PROJECT, YOU MAY EITHER DESIGNATE A FULL TIME <br />CONSTRUCTION WASTE MANAGER OR ASSIGN RESPONSIBILITY <br />TO THE JOB SUPERVISOR OR APPROPRIATE PERSONNEL.j <br />B. Distribution: The Contractor shall distribute <br />copies of the Waste Management Plan to the Job site <br />Foreman, each Subcontractor, the owner, and the <br />Architect. <br />C. Instruction: The Contractor shall provide on-site <br />instruction of appropriate separation, handling, <br />and recycling, salvage, reuse, and return <br />methods to be used by all parties at the <br />appropriate stages of the Project. <br />D. separation facilities: The contractor shall lay <br />out and label a specific area to facilitate <br />separation of materials for potential recycling, <br />salvage, reuse, and return. Recycling and waste <br />bin areas are to be kept neat and clean <br />and clearly marked in order to avoid contamination <br />of materials. <br />E. Hazardous wastes: Hazardous wastes shall be <br />separated, stored, and disposed of according to <br />local regulations. <br />F. Application for Progress Payments: The Contractor <br />shall submit with each Application for Progress <br />Payment a Summary of Waste Generated by the <br />Project. Failure to submit this information shall <br />render the Application for Payment incomplete and <br />ahall delay Progress Payment. The Summary shall be <br />submitted on a form acceptable to the Owner <br />[SEE APPENDIX ] and shall contain the following <br />information: <br />1. The amount (in tons or cubic yards) of <br />material landfilled from the Project, the <br />identity of the landfill, the total amount of <br />tipping fees paid at the landfill, and the <br />total disposal cost. Include manifests, weight <br />tickets, receipt, and invoices. <br />
The URL can be used to link to this page
Your browser does not support the video tag.