Laserfiche WebLink
Letter to: Vergine Papazyan <br />From: Chris Trussell, Public Works <br />RE: Activity # 10-02197 <br />Date: April 26, 2010 <br /> <br />Page 2 <br /> <br /> <br /> <br />6)Please provide method of maintaining adequate roof ventilation through out roof system per <br />section 806, 2008 ORSC. <br /> <br /> <br />7)Please provide construction plans and engineer calculations for attached covered porch. <br /> <br /> <br />8)Please provide revised construction plans reflecting all items being requested and any <br />changes required by engineer of record. All engineering details, schedules, hold-downs and <br />shear-wall locations shall be noted on revised sets of plans. <br /> <br />Please provide all the above-listed items to proceed on with the plan review process. Additional <br />information may be needed after above-listed items are received. If you have any questions <br />please feel free to contact me at (503) 588-5147. <br /> <br />Sincerely, <br /> <br /> <br />Chris Trussell <br />Marion County Plans Examiner <br /> <br />CT:dls <br /> <br />K:\Dept-App\BI\Offlink\DOCS\10-02197\Letter.doc <br /> <br />