Laserfiche WebLink
Phone: (503) 58,9-1727 Fax: (503) 589-!728, <br /> <br />POST FRAME BUILDING CONSTRUCTION NOTES <br /> <br />Project No: <br />Date: <br />Client: <br />Owner: <br />Address: <br /> <br />99-241 <br />May 18,1999 <br />Kelly Pdnce <br />Kelly Pdnce <br />12175 W. Stayton Rd. ~//.~/~/[~,f~,aj~' <br />Stayton, OR 97325 u/ZAW.,O~, <br /> C~/~ <br /> EXPIRES: ' ~ ~, I ~'~ <br /> <br />1. All concrete rc shall be 2500 psi minimum at 28 days. The concrete shall be mixed <br /> in the correct proportions prior to placement. No special inspection is required. <br /> <br />All framing lumber shall be at least the minimum noted on the drawings. Lumber not <br />specifically called out may be Standard or better. No. 2 DOUG-FIR may be <br />substituted for No. 2 HEM-FIR. <br /> <br />3. Insure that ALL lateral bracing required by the manufacturer of the pre-engineered <br /> trusses have been installed in accordance with the manufacturer's instructions. <br /> <br />4. Install the posts to the depth given in the drawings. Install a 6' thick (min) concrete <br /> pad in each posthole. The posthole diameter shall be as noted in the drawings. The <br /> posts shall be cantered on the footings. The contractor shall insure that the backfill <br /> in the postholes is cast against undisturbed soil. <br /> <br />5. If the drawings specify concrete backfill in the postholes, install (10) 20d galvanized <br /> nails 2' deep into two opposite post faces on the embedded area of the post. <br /> <br />If the drawings specify granular backfill in the postholes, the backfill shall be 518" to <br />3/4' (-) gravel or crushed rock. The contractor shall insure that the backfill is <br />saturated prior to backfilling and is compacted after each 6" lift. <br /> <br />If the drawings specify natural backfill in the postholes, the backfill shall be well- <br />graded native soil (free from all organics and large cobbles). The contractor shall <br />insure that the backfill is saturated prior to backfilling and is compacted after each <br />lift. <br /> <br />8. If the drawings specify sand backfill in the postholes, the contractor shall insure that <br /> the sand is saturated prior to backfilling and is compacted after each 6' lift. <br /> <br />9. Install all steel sheathing to the interior framing members (girts and purlins) per the <br /> Typical Screw Schedule given on the Standard Details drawing unless noted <br /> otherwise. <br /> <br /> <br />