My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUILD - 1502483
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
98-XXXXX
>
BUILD - 1502483
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2013 12:08:20 PM
Creation date
10/12/2004 7:22:35 AM
Metadata
Fields
Template:
Permits
Permit Address
945 OLNEY ST
Permit City
AUMSVILLE
Permit Number
555-98-00845
Parcel Number
082W25A 00500
Permit Type
BUILD
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARtON COUNTY BUILDING INSPECTION <br /> <br /> 3150 Loncmmter Dr. N.E. * Suite C * Salem, Oregon 97305-1398 <br />~ Hour~: 8:00,4:30 · Phone: (503) 588.5147 · 24-HR Inspection Line: (503) 373.4427 <br /> <br />DATE/TINE : ~2/25/98 B8:31 <br />TYPE = Ne# Commercial <br />OCCUPANCY : B <br />CONST TYPE = V-N <br /> <br />BUILDING PERNIT <br /> <br /> PAGE <br /> All spri?ier pipe and fittings shall be so installed that <br /> the syst~ can be drained. <br /> Provisions shall be Made tO properly drain all pa*ts of the <br /> system. <br />t4. APPROVAL OF SFR[NEL~.R SYSTem. (NFPA 13 Sec 8-1) <br /> The installing contractor shall: <br /> a) Notify the authority having jurisdiction and the owner's <br /> reoresentative of t~e time and date testing ~ill ~e <br /> performed. <br /> b) Perform all required acceptance tests. (See Section 8-2) <br /> c) COMplete and sign the appropriate Contractor's Haterial <br /> and Test Certificate(s) [see Figures 8-1(a) and 8-1(b)]. <br />15. S¥STEH OPERATIONAL TESTS. (NFPA 13 Sec 8-2.4) <br /> Waterflow detecting devices ~ncluding the associated alarm <br /> circuits shall be flow tested through the inspector's test <br /> connection and shall result i~ an audible alar~ on the <br /> premises withi~ 5 Mar, utes after such flow begins and until <br /> such flo~ stops. <br /> The ~ain drain valve shall be opened and remain open until <br /> the ~ysteM pressure stabilizes. The static a~d residual <br /> pres,sures shall be recorded o~ the co~tractor s test <br /> certificate. <br />t6. INSTRIJCIlONS. (NFPA 13 Sec 8-4) <br /> The install~n~ contractor shmll provide the owner with: <br /> a) Ail literature and instructions provided by the Manu- <br /> facturer describin~ proper opera~ion and Maintenance of <br /> a~y equipment and devices installed, <br /> b) Publication titled NFPA 25~ Standard for the Inspection, <br /> Testing, and Maintenance of Water-Based ~ire Protectio~ <br /> Systems. <br />;,7. HYDRAULIC QESTGN ~NFORNA'I*ION SIGN. (NFPA 1~ Sec 8--5) <br /> l*h~ installin~ co~tractor shall identify a hydraulically <br /> designed sprinkler system with a permanently Marked weatbe;'- <br /> prno~ ~etal or rigid plastic sign secured with co~rosion- <br /> resist~nt wire, c~ain, or other approved Means. Such signs <br /> shall be placed at the alarm valve supplyin~ the corre- <br /> spo~dinq ~ydrauIically designed area. <br /> HYDRAULIC DESIGN INFORMATION 8IGN~ cont'd. <br /> The sign shall include the following infon~ation: <br /> a) Location of the design area or ~reas. <br /> b) ~ischarqe densities over the design area or areas. <br /> ,c) Require~ flow amd residual p~*essure demand at the base <br /> of riser. <br /> d) Occupancy classification or commodity classificatio~ and <br /> Maximum ~erMitted storage beight and'configuration. <br /> e) Hose stream demand included in addition to the spri~kle~ <br /> demand. <br /> SYST~ MAINTENANCE. (NFPA 13 Sec 18-1) <br /> A sprinkler system installed in ~ccordance with this <br /> standard shall be properly inspected~ tested, a~d Maintained <br /> in accordance with NFPA 25, Standard for the Inspection, <br /> Testing, and Maintenance of Water-Based Fire Protection <br /> SysteMs~ to provid~ at least the same level of perforMa~ce <br /> and prot~ctio~'~ as designed. <br /> I'hp owner shal! be responsible for m~intair~iog the system <br /> and keeping the system i~ good operating condition. <br /> <br />18. <br /> <br />19. <br /> <br />PERNIT H0 : 98-88845 <br />STATUS : ISSUED <br />ISSUES = 82/25/1998 <br />TO EXPIRE : ~8/24/1998 <br /> 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.