Laserfiche WebLink
Mike Deegan <br />May 14, 2001 <br />Page 2 <br /> <br />In order to correct the deficiancigs of the system construction, a system designer who meets the <br />qualifications of OAR 340-052 shall submit for Deptuhnent review and approval a plan within 30 <br />days from the date of this letter. That designer that you hire shall certify that the system meets the <br />requirements of an approved plan and OAR 340-071. This will likely require to uncover various <br />portions of the system so that conformance with plans and roles can be verified. <br /> <br />The above violations (listed as # 3 - 6) are considered Class II violations of your permit. <br />Oregon Administrative Rules (OAR) 340-12-041(:Z)(c) provides that a permittee shall not <br />receive more than three NONs for Class II violations of the same permit within a thirty-six <br />(36) month period without being issued a more formal enforcement action called a Notice of <br />Permit Violation (NPV). The Department may, however, issue a NPV prior to the third NON. <br />The Department requests your cooperation in ensuring that these violations do not recur. <br /> <br />If you have any questions regarding this letter, or if I can be of any assistance, please call me at <br />(541) 686-7838 x 230, toll free in Oregon at (800)844-8467 or by email at <br />Trox.randall~deq.state.or.us. <br /> <br />Natural Resource Specialist <br /> <br />Greg Farrell, DEQ, Roseburg <br />Dan Buss, Sep-Tech Excavation, Inc. <br />Zan Ewing, Marion County <br /> <br /> <br />