My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUILD - 1464107
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
97-XXXXX
>
BUILD - 1464107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2013 9:27:04 AM
Creation date
8/9/2004 1:17:25 PM
Metadata
Fields
Template:
Permits
Permit Address
12184 EHLEN RD NE
Permit City
Aurora
Permit Number
555-97-00600
Parcel Number
041W09DC00200
Permit Type
BUILD
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/"'"~ i Bird Brain Auto S al~s~ <br /> g765S.W. Avery <br /> Tualafin, Oregon 97062 <br /> <br /> FAX: 503-692-1413 <br /> <br /> ATTENTION: The Sharps <br /> <br />Marion County Public Wor.k.s Department <br />3150 Lancaster Drive N.E. <br />Salem, Oregon 97305 ~555,~a <br />ATTENTION: Mr. Alan Hale <br /> <br />Marion County Building Department <br />3150 Lancaster Drive N.E. <br />Salem, Oregon 97305 <br /> <br />Boatwright Engineering Inc. <br /> 2613 12'~h ST SE, SALEM, OREGON 97302 <br /> civil engineers · land surveyors <br /> (so3) 363-9225 (F^X) 363-1051 <br /> <br />August 13, 1997 <br /> <br />INSPE~T,~N <br /> <br />REFERENCE: SANITARY SEWER SERVICE NEW OFFICE/STORE BUILDING <br /> 12300 BLOCK, EHLEN ROAD N.E., AURORA, OREOON <br /> <br />Gentlemen, <br /> <br /> Bird Brain Auto Parts etc., Sales has requested that I advise them as to delays in the <br />availability of Sanitary Sewer from the Fargo Center Interchange Service District and if it would <br />be possible to utilize bathrooms in an existing structure on the common property with a new <br />building. <br /> <br /> This sewer project has been delayed by a series of Land Use challenges to the Land Use <br />Board of Appeals (LUBA) resulting in the Contract being delayed beyond the control of Marion <br />County, the project engineer or contractor. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.