Laserfiche WebLink
l. The property is designated Industrial in the Salem Area Comprehensive Plan. The purpose of this designation is to <br />provide areas for industrial development within urban areas. However, the parcel is currently zoned UT-10 <br />(Urban Transition), which is intended to retain and protect for future urban use properties which are undeveloped <br />or underdeveloped for later use of the land for planned urban uses. <br /> <br />2. The property is located on the north side of Timbet Dr SE 350 feet to the west of the intersection between Timbet <br />Dr and Eastland Ave SE. The parcel currently contains 2 shop structures near Timbet Dr, but most of the parcel <br />north of these structures is undeveloped and does not have a paved or gravel surface. The parcel was created in <br />1910 as Lot 38 of the Hanshaw Fruit-Farms & Lynd subdivision and has not changed its configuration since. <br />Therefore, the parcel is legal for land use purposes. <br /> <br />3. Surrounding uses include a mixture of residential, agricultural, and industrial uses within the immediate area. The <br />parcels adjacent to the west and northwest are currently in use as farm fields, but all parcels north of the Timbet <br />Dr right-of-way (both the undeveloped and developed portions) are designated as industrial in the Salem <br />comprehensive plan. The parcel directly to the east is also dedicated to industrial uses, but beyond this are parcels <br />already annexed into the City of Salem that have yet to be developed. Additionally in this direction is a railroad <br />line and the Mill Creek floodplain. The parcel to the south on the other side of Timbet Dr is in use as a tree <br />service business, but the underlying comprehensive plan designation for both this parcel and all other parcels <br />south of the Timbet Dr right-of-way is residential. Most of the parcels to the south are already developed with <br />residences, primarily at the top of a 100-foot ridge that starts 730-feet south of the subject parcel. <br /> <br />4. The applicant proposes to establish an automotive towing yard, automobile parking yard in conjunction with that <br />towing service, and eventually an automobile dismantler business on a 4.77-acre parcel located at 3901 Timbet Dr <br />SE in a UT-10 zone as a conditional use. <br /> <br />5. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> Requirements: <br /> <br />A. PW Eng records indicate an onsite stormwater detention system was designed, permitted and <br />constructed under Permit #UR97-062 for prior site development. The detention system was not depicted <br />on the current land use Application site plan. For reference, the engineering design plan showed the <br />detention system to be situated in the southwest portion of the property, adjacent to the west property <br />line. Prior to enacting the proposed use, Applicant is required to perform maintenance restoration on <br />the detention system and have it inspected by PW Engineering to verify that it substantially adheres to <br />the permitted design, and make any modifications deemed necessary under a Stormwater Permit <br />through PW Engineering to accommodate potential expanded use of the property. Please note that the <br />detention system design was predicated on a total of 1.0 acre of impervious (building, paved / gravel <br />parking) surfaces. <br /> <br />B. Transportation System Development Charges (TSDCs) may be assessed for a Building change-in- <br />occupancy on the existing structures if the proposed use of those structures were to also correspond <br />with a resulting estimated net increase in average daily traffic. <br /> <br />Marion County Septic provided the following comments: <br /> <br />Conditions of Approval: An Authorization is required for the change of use. <br /> <br />Additional Info: This site is served by a holding tank. Authorization applications must also contain a <br />pumping contract with a licensed and certified pumping company. Annual holding tank reports must be <br />sent to the county to certify compliance of the holding tank. The last report was submitted in Dec 2024. <br /> <br />Marion County Building commented: “No Building Inspection concerns with proposed change to existing <br />structure(s) use. The existing structures on site were properly permitted, with certificates of occupancy issued, and <br />the change of use would not warrant the need for a change of use or occupancy permit as the proposed use and <br />occupancy are similar to the existing. If alterations to the existing structures are proposed, then permit(s) would be