Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />CON~,4U NITY DL~VELOPMENT <br />OF. PAR, TME NT <br /> <br />Tim Boyce <br />8535 SW seminole Rd. <br />Tualatin, Oregon 97062 <br /> <br />SIT~ #9~-03911t T=4s, ~=lw, S~12 <br />SITE ADDRE;S~ 14747 Albers Way NE, Aurora <br /> <br />investigation, it has been determined that the st=e ~peeifie~ e~ year ~pplica- <br />tien does not qualify for a standard septic system er any of the alternative <br />systems. The conditions on the site do not meet the minimum requirements of <br />the Depa=~men~ of Environmental Q~ality on-site Sewage Disposal Rules. These <br />~ules mre specified in Oregon Administrative R~les, Chapter 340, Division 71, <br />Sections 100 through 600. Consequently, this site ~us~ be de~i~d0 <br /> <br />The principal reasons for denial of this elte are rela~ed to ~aru~1 size and <br />setbacks and slopes. The ~olla~i~ ~ragra~hs Outline ~he s~eclfic reasons for <br />this denial. <br /> <br />PARCEL SIZE <br /> <br />AND $~TBACK~; <br />There is insufficient area O~ the proDerty for i~stallatloe of an <br />approved on-site Septic system which will meet the setbacks as <br />required in ~he D.~.Q. ru~es. The setbacks which are of particular <br />concern are circled on the attached sheet. Each lot or parcel mu~t <br />have sufficient u~able ar~a available to acco~amodate an initial <br />and replacement septic system. <br /> <br />SLOPE~: <br /> l, <br /> <br /> The natural land alone in the area proposed for installation of <br /> the on-site sewage system is greater than forty-five (4~) percent. <br /> <br /> 2. No septic System may be constr~¢te~ on a slope greater than forty- <br /> five (4~) percent. The maximum SlOpe for a standard septic system <br /> is thirty (~0) percent and the maxim~ slope for the alternative <br /> steep slopa system is forty-five (4S) ~rcent. <br /> <br />It should De noted that this study was done only in the area proposed on your <br />application for on-site sewage disposal, within the boundaries of your proper- <br />ty, it is possible that soil conditions in a different area of the property <br />may be different than those examined in the existing =asr pits. If you feel <br />that better soil conditions may exist in another area of the property, <br />additional test pits will be inspected with no additional charge. Prepare a~d <br />sub~it a new site plan showing the new afsa 9reposed for evaluation. Notify <br />this office of your request in writing and within ninety (90) days of .the <br />initial site evaluation. <br /> <br /> <br />