Laserfiche WebLink
Vtnce Pavlice~ <br />Novembe~ 11~ 1976 <br /> <br />A 1000 gallon septic ~ank met at the correct elevatloe to <br />achieve gravity flow will be required for the three bedroom <br />system. The filling and construction can be completed only <br />when the soil moisture content ia le~ than 1~ (generally <br />June-September of any year).- The draln£1eld will be se~ b~ol~ <br />50' from the east line, 100' from the road line and ab least <br />100' from wells. <br /> <br />I recommend that you make the variance application in January <br />1975 $o the variance hearing can be held in Febuary Or N~rch <br />when the water level ca~ be observed. Co~tact me ben days <br />prior to the hea~ln$ and I will accompany you to a~swer any <br />questions. If you have a~y ~es~one please contact me. <br /> <br />Sincerely, <br /> <br />W. ~. DOAK <br /> <br /> <br />