Laserfiche WebLink
PAGE 2 December 16, 2013 <br /> PLUMBING FIXTURE ANALYSIS <br /> �/ GERVAIS MIDDLE SCHOOL PHYSICAL EDUCATION EXERCISE ROOM <br /> GERVAIS SCHOOL DISTRICT 1 <br /> RSS ARCHITECTURE, P.C. <br /> ARCHITECTS PROJECT NO. 1314 <br /> Fixtures in adjacent block building, see Site Plan 25/A1.0,allowed to be included <br /> in Existing Fixtures Available per OSSC 2902.4.2. <br /> 7. The Gervais Middle School Physical Education Exercise Room structure is for use by <br /> Gervais Middle School students. Existing plumbing fixtures in the Middle School <br /> classroom wing are compliant with Code required fixture counts for that structure and <br /> corresponding occupant load. The occupant load of the Middle School classroom wing <br /> is not compounded with the new exercise room structure. Full occupant loading of the <br /> classroom wing and exercise room structure simultaneously is likely to never occur, <br /> either one or the other would be fully loaded, not both at the same time, due to <br /> educational function and purpose of each structure. <br /> END OF PLUMBING FIXTURE ANALYSIS <br /> L <br />