My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12986249
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
12-XXXXX
>
12986249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 8:00:11 PM
Creation date
7/30/2025 9:43:53 AM
Metadata
Fields
Template:
Permits
Permit Address
6203 SHAW LN SE
Permit City
Aumsville
Permit Number
555-12-05259
Parcel Number
082W24A 00800
Permit Type
1 & 2 Fam Dwelling (New Only)
Extra Information
Alternate Material(s) and/or Method(s)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
couple at position 22 was placed on the unexposed face in a small area J <br /> where plaster had not been applied. The thermocouples at positions 24 <br /> and 25 were attached to the reinforcing steel in the assembly. Number <br /> 24 was attached to the vertical rebar and number 25 was attached to the <br /> horizontal rebar. The maximum temperatures recorded at 240 minutes <br /> (°F) were: <br /> Thermocouple Maximum <br /> Position Temperature Temperature Rise <br /> 22 105 38 <br /> 24 354 287 <br /> 25 303 236 <br /> Hose Stream Test: <br /> The hose stream test was conducted in accordance with 510.3, Optional <br /> Program. This option permits conductance of the hose stream test <br /> immediately following the expiration of the fire endurance test, <br /> thereby eliminating the necessity of testing an additional wall <br /> assembly for half the endurance classification being sought. The <br /> conditions of the hose stream test were in accordance with Section 10, <br /> Table 1. The test wall withstood the hose stream test. <br /> CONCLUSIONS <br /> The following conclusions represent the judgement of Commercial Testing <br /> Company based on the results of this test. The test results apply only to <br /> the assembly tested and are not necessarily indicative of results which may <br /> be obtained on apparent identical or similar materials and/or construction <br /> techniques. <br /> Fire Resistance: <br /> The assembly maintained its structural integrity throughout the test <br /> period. Passage of flames and hot gases through the assembly were not <br /> sufficient to ignite cotton waste fibers. The temperature rise on the <br /> unexposed surface did not exceed permissible temperature limitations <br /> imposed by the test method. The assembly withstood the hose stream <br /> test with no projections of water through the unexposed face. <br /> Fire Resistance Rating: <br /> It is concluded that the wall assembly covered by this test report, <br /> when constructed of the materials and in the manner described herein, <br /> has a Fire Resistance Rating of 4 hours. <br /> tioLlak,e <br /> COMMERCIAL ! TESTIIIO COIiiPAIIY <br />
The URL can be used to link to this page
Your browser does not support the video tag.