Laserfiche WebLink
Association small museum <br /> ir building Phase I (Dezotell <br /> Building),2400ft2. This <br /> building is currently being <br /> used as an orientation <br /> facility displaying artifacts <br /> from each Partner Museum. <br /> According to the permit <br /> documents restrooms were <br /> not required due to <br /> availability in an adjacent <br /> building(8) <br /> Note that permit lists A-3 <br /> occupancy while the <br /> certificate of occupancy <br /> states B-2. (this building <br /> was expanded in 2004, see <br /> item 5) <br /> 3. <br /> 37 Pacific Northwest Truck S-2 1998 98-08124 <br /> Museum building number 2. <br /> This 15,000 ft2 building has <br /> S-2 occupancy but is <br /> included here because it was <br /> specifically exempted from <br /> restrooms. "Every building <br /> shall have sanitary fixtures <br /> installed as required by <br /> section 29 and table No. <br /> 29-A". "When sanitary <br /> fixtures are located in an <br /> adjacent building on the <br /> same property toilet <br /> facilities may be omitted in <br /> the new building."Are S-2 <br /> buildings in 29-A? This <br /> language does not seem to <br /> exist in current 2901?? <br /> 4 <br /> ♦ 31 Antique Powerland Museum A-3 2004 04-02984 <br />