Laserfiche WebLink
<br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Zoning Administrator. If there is any doubt that the application conforms with adopted land use policies and <br />regulations the Zoning Administrator must condition or deny the application. Anyone who disagrees with the decision <br />may request that the application be considered by a County hearings officer after a public hearing. The applicant may also <br />request reconsideration (one time only and a fee of $200) on the basis of new information subject to signing an extension <br />of the 120 day time limit for review of zoning applications. <br /> <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or <br />consideration by a hearings officer, must be in writing (form available from the Planning Division) and received in the <br />Planning Division, 5155 Silverton Rd. NE, Salem, by 5:00 p.m. on July 31st, 2025. If you have questions about this <br />decision contact the Planning Division at (503) 588-5038 or at the office. This decision is effective August 1st, 2025 <br />unless further consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />l. The property is designated RM (Multi Family- Residential) in the Salem Area Comprehensive Plan. The purpose <br />of this designation and the corresponding RM (Multi-Family Residential) and UD (Urban Development) zones <br />are to provide urban development consistent with multifamily housing and the applicable city zone which is <br />multifamily. The western 100’ of the property is zoned UD. The eastern 280’ of the property is zoned RM and is <br />where the proposed development will be sited. <br /> <br />2. The property is located 0.15 miles directly north of the intersection of Stortz Ave NE and Lancaster Dr NE. Tax <br />lot 3700 currently contains a parking lot used in conjunction with the Boys & Girls club on tax lot 3800. In the <br />southeastern corner of tax lot 3700 is a 12,000 square foot grassy area where the proposed office building would <br />be sited. <br /> <br />3. Surrounding properties are zoned Multifamily Residential with a mix of duplexes and apartment complexes, while <br />one property across the street is zoned Public and home to Chemeketa Community College. Directly north across <br />the parking lot is the Boys & Girls Club that was established in 2020 with the conditional use permit CU20-020. <br /> <br />4. The applicant proposes to establish office space for various civic and social organizations on a 0.89-acre parcel. <br /> <br />5. Various agencies were contacted with requests for comment. <br /> <br /> Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br /> <br /> ENGINEERING REQUIREMENTS <br /> <br />A. At the time of application for building permits an administrative level access permit will be required to tie <br /> parcel future addressing to the existing shared Lancaster Drive approach. <br /> <br />B. A county Construction Erosion Permit is required prior to ground disturbing activities including clearing, <br /> grubbing, grading and rocking. <br /> <br />C. Stormwater discharge from the building site will need to be connected to the existing onsite stormwater <br /> collection system that was designed for full buildout to provide adequate detention and water quality <br /> treatment for the Boys & Girls site as well as the subject property future development. Since the <br /> stormwater system was constructed in anticipation of this, no new stormwater permit is required; <br /> however, a Building Plumbing permit is required to make necessary connections to the existing system as <br /> depicted on a recently submitted civil engineering plan set by Westech Engineering. <br /> <br /> <br />D. Utility service extensions within the public Right-of-Way require permitting through PW Engineering. <br />