Laserfiche WebLink
lqa , Qn count.q <br /> <br /> OREGON <br />GOMM UN]TY DEVELOPMENT <br />DEPARTMENT <br /> <br />NOTICE OF APPROVAL: <br /> <br />EVALUATION REPORT FOR AN <br />ON-SITE SEWAGE DISPOSAL SYSTEM <br /> <br />December 6, 1994 <br /> <br />3475 BIEGLER ~ANE SOUTN <br />SALEM, OREGON 97302 <br /> <br />SUBJECT: SITE #94-4133, T:10S, R:5E, S:02AD, T/L:2700 <br />SITE ADDRESS~ 205 LAKECREET DRIVEr DETROIT~ OREGON 97342 <br /> <br /> Our office has completed the evaluation for the proposed installation of <br />an on-site sewage system. The septic system is proposed to serve a two <br />bedroom residence on the property. <br /> <br /> Eased on the results of this study, on-site sewage disposal appears <br />feasible for the property. Approval is for the installation of a STANDARD <br />SEWAGE DISPOSAL SYSTEM, as described in the attached construction detail and <br />setback sheets. <br /> <br /> This approval is given on th~ basis that the lot or parcel will not be <br />further partitioned or subdivided and that conditions on this property and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall not be altered or <br />modified by cutting, filling, or other developmental activities which would <br />impede the successful operation of the initial or replacement soil absorption <br />systems. Failure to comply with the above items may void this approval. <br /> <br /> This report is ~p~.a permit to install th~..sewaqe system. A permit must <br />be obtained before any sys~.gm construction occurs. A permit may be issued 'only <br />after the property has been found to be compatible with applicable LCDC <br />acknowledged local comprehensive land use plan. A Statement of Land Use <br />compatibility or its equivalent is required before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to scale (ex. 1" = 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer. <br /> <br /> This site evaluation report is valid until an on-site sewage system is <br />installed pursuant to the construction permit obtained from this office, or <br />until earlier cancellation pursuant to the Environmental Quality Commission <br />rules. Subject to the above, this report runs with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Our office hours are Monday through Friday, 8~00 to 4:30. <br />our office if Iou have any questions concerning this report. <br /> <br /> ·C' nty Build~hg I~speotion <br />LEE A. GRIMES, SOIL SCIENTIST <br /> <br /> <br />