Laserfiche WebLink
February 6, 1995 <br /> <br />APPLICANT: <br />SITE NUMBER: <br /> <br /> STANDARD SYSTEM CONSTHUCTION DETAIL SNEET <br /> <br /> PARTITION <br />GLORIA JOHNSON <br />94-4605, WEST pART OF T/L:500. 2.5 OF 5 ACRES. PARCEL <br /> <br /> Your site has been found suitable for a STAiTDAP/) ON-SITE SEWAGE DISPOSAL <br />SYSTEM, The following consDructi0n specifications shall apply to the installa- <br />tion of your septic system, <br /> <br />The septic tank shall have a minimum liquid capacity of 1000 <br />gallons. <br /> <br />The projected daily sewage flow for this project is calculated at <br />~B0 qallons per day. Based on soil conditions observed on this <br />site, the disposal field will be sized at lB0 lineal feet per 150 <br />qalloR~, of projected daily sewage flow, A minimum of 450 lineal <br />feet of disposal field will be required for your propose~ develop- <br />ment, The disposal trenches are constructed two (2) feet wide and <br />on minimum ten (10) foot centers and with no line exceeding 125 <br />feet in length. The trenches and perforated pipe are installed <br />level (il") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with serial distribution <br />with a minimum trench depth of 24 inches and a maximum trench <br />depth of 24 inches, There must be at least 12 i~ches of backfill <br />over the top of the gravel, measured from the natural ground <br />surface. <br /> <br /> A groundwater interceptor is required as part of this system. This <br />interceptor trench must be constructed a minimum twelve (!2) inches wide by 48 <br />inches deep with 42 inches of clean gravel placed over a four (4) inch smooth <br />wall perforated pipe. The interceptor must be located at least ten (10) feet <br />upslope from the disposal field and must discharge through a watertight, non- <br />perforated pipe beside or below the disposal field. A separation of 15 feet is <br />required from the septic tank if the tank is located upslope of the groundwa- <br />ter interceptor. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office, A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIA~ CO~rDITIONS: <br /> The original, standard drainfield must be constructed within the <br /> immediate area of the northeasterly test pit. A pre-construction field <br /> stakeout will be necessary to establish the elevations and locations of <br /> the individual drain~ield lines and the location of the curtain drain. <br /> Refer to the stakeout procedure and the setback list for details to <br /> complete the stakeout_ A list of installers who can assist with the <br /> stakeout is included for your convenience. The sand filter drainfield <br /> site is just above the standard drainfield. It too, needs the protection <br /> of an upslope curtain drain, well construction must be deferred, pending <br /> review and approval of the pre-construction field stakeout, soil con- <br /> ditions are marginal for standard system consideration. Use care not to <br /> alter the natural topsoil prior to drainfield construction. Drainfield <br /> installation should be limited to the dry soil, summer season_ <br /> <br />THIS IS MOT A PER~{IT TO INSTALL T~E SEPTIC SYSTEM. DO NOT INSTALL THE SYSTEM <br />UNTIL A VALID PERMIT ~AS BEEN ISSUED BY THIS OFFICE. <br /> <br /> <br />