Laserfiche WebLink
Marion County <br /> <br /> OREGON <br />COMMUNITY DEVELOPMENT <br />DI~PARTMENT <br /> <br />NOTICE OF APPROVAL: <br /> <br />EVALUATION REPORT FOR Alq <br />ON-SITE SEWAOE DISPOSAL SYSTEM <br /> <br />May 4, 1995 <br /> <br />ALAN TURNER <br />C/O JAMES HANSEN <br />3340 COMMERCIAL STREET SE <br />SALEM, OREGON 97302 <br /> <br />S~BJECT: SITE #94-4042, <br />SITE ADDRESS: <br /> <br />FILE <br /> <br /> T:SS, R:2W, S:26C, PO T/L:iS00 <br />7585 SUNNYBROOK LANE SE. AUMSVILLE, OR 97325 <br /> <br /> Our office has completed the evaluation for the proposed installation of <br />an on-site sewage system. The septic system is proposed to serve a three <br />bedroom residence on the property. <br /> <br /> Based on the results of this study, this area does not appear suitable <br />for a standard on-site sewage system. However, the site appears suitable for <br />the installation of an alternative SD_ND FILTER PLUS FULL CAPPING FILL SYSTEMS <br />as described in the attached construction detail and setback sheets. <br /> <br /> This approval is given on the basis that the lot or parcel will not be <br />further partitioned or subdivided and that conditions on this property and on <br />adjacent properties are not altered in any manner which would prohibit the <br />issuance of a permit. Soils in the approved area shall not be altered or <br />modified by cutting, filling, or other developmental activities which would <br />impede the successful operation of the initial or replacement soil absorption <br />systems. Failure to comply with the above items may void this approval. <br /> <br /> This report is not a permit to install the sewaqe system. A permit must <br />be obtained before any system construction occurs. A permit may be issued only <br />after the property has been found to be compatible with applicable LCDC <br />acknowledged local comprehensive land use plan. A Statement of Land Use <br />Compatibility Or its ecI1/ivalent is reqllired before a construction permit can <br />be issued. <br /> <br /> A detailed plot plan, drawn to scale (ex. 1,, = 60'), must be submitted <br />with the permit application before the construction-installation permit can be <br />issued. The system must be installed by the property owner or a DEQ licensed <br />septic installer, <br /> <br /> This site evaluation report is valid until an on-site sewage system is <br />installed pursuant to the construction permit obtained from this office, or <br />until earlier cancellation pursuant to the Environmental Quality Commission <br />rules. Subject to the above, this report runs with the land and will automati- <br />cally benefit subsequent owners. <br /> <br /> Our office hours are Monday through Friday, 8:00 to 4:30. Please contact <br />our office if you have any questions concerning this report. <br /> <br />LEE A. GRIMES, SOIL SCIENTIST <br /> <br /> <br />