Laserfiche WebLink
A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Requests for reconsideration, or <br />consideration by a hearings officer, must be in writing (form available from the Planning Division) and received in the <br />Marion County Planning Division, 5155 Silverton Road NE, Salem, by 5:00 p.m. on June 13th, 2025. If you have <br />questions about this decision, contact the Planning Division at (503) 588-5038 or at the office. This decision is effective <br />June 16th, 2025, unless further consideration is requested. <br /> <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br /> <br />1. The subject property is designated Primary Agriculture in the Marion County Comprehensive Plan and <br />correspondingly zoned EFU (Exclusive Farming Use).The purpose of the EFU zone is to provide areas for <br />continued practice of commercial agriculture. These areas are generally well suited for large-scale farming. <br />The EFU zone is also intended to allow other uses that are compatible with agricultural activities, to protect <br />forests, scenic resources and fish and wildlife habitat, and to maintain and improve the qu ality of air, water <br />and land resources of the county. <br /> <br />2. The property is located on the north side of Mt. Angel Gervais Road, approximately one mile east of its <br />intersection with Miller Road. <br /> <br />3. The subject parcel was created in its current configuration by Partition Plat 2000-40 in 2001. This was part of <br />land use case P/CU99-026. This was a partition application to divide the tissue lab from the main farm parcel <br />and run the tree tissue lab as a commercial activity in conjunction with farm use. This parcel is not in the special <br />farm tax deferral program. The Planning Department has determined that the parcel is legal for land use purposes. <br /> <br />4. Surrounding properties contain a mixture of various-sized commercial farm operations in an EFU zone. <br /> <br />5. Various agencies were contacted about the proposal and given an opportunity to comment. <br /> <br />Marion County Building Division commented: <br />Permit(s) are required to be obtained prior to the installation of carports with solar arrays, other structures with <br />solar arrays, and/or the alteration of existing structures to include solar arrays. Fire separation requirements from <br />2022 OSSC Chapter 7 will be closely reviewed, amongst the other provisions of the state building code. It’s <br />recommended these structures and solar arrays be evaluated by an Oregon licensed architect for fire and life <br />safety purposes. Fire rated construction and/or fire sprinklers may be required. <br /> <br />Marion County Septic commented: <br />All proposed structures must meet a 5ft minimum setback to septic tanks and effluent lines, and a 10ft minimum <br />setback from foundations to the drainfield is required. <br /> <br />The Marion County Tax Accessor provided information about the property’s tax liabilities. <br /> <br />All other contacted agencies either failed to comment or stated no objection to the proposal. <br /> <br />6. The applicant is proposing to reduce the required 20-foot property line setback to five feet on the northern and <br />eastern property lines. This is to allow for the siting of covered carports that will support photovoltaic panels. <br />The applicants state that they are attempting to minimize the amount of the impervious parking surface that <br />would have to be covered so as not reduce parking and maneuvering space in the parking lots. They further <br />state that they are attempting to provide sufficient structural surface to produce as much solar electricity as <br />they can on the site to offset their electrical power consumption for cultivating their blueberry, hazelnut, and <br />maple plants. To accomplish this the applicants are requesting to reduce the 20-foot property line setbacks <br />required in the EFU zone to five feet along the northern and eastern property lines. The southern and western <br />property lines are adjacent to roadways and the standard setbacks will remain in effect. <br /> <br />7. To obtain a variance, the proposal must meet the criteria found in Marion County Code 17.122.020(A). These <br />criteria are: <br /> <br />1. There are unnecessary, unreasonable hardships or practical difficulties which can be relieved only by <br />modifying the literal requirements of this title; and <br /> <br />The subject property is zoned EFU and has setbacks of 20-feet for all structures except ag-exempt structures. This