Laserfiche WebLink
November 27, <br /> <br />APPLICANT: <br />SITE NUMBER: <br /> <br />SAND FILTER SYSTEM CONSTRUCTION DETAIL SHEET <br /> <br />1992 <br /> <br /> HARRY THERRIEN <br /> 92-3624 <br /> <br /> Your site has been found suitable for a SAND FILTER ALTERNATIVE S~WAGE <br />DISPOSAL SYSTEM. The following construction specifications shall apply to the <br />installation of your septic system. <br /> <br /> 1. The septic tank shall have a minimum liquid capacity of lO00 <br /> gallons. <br /> <br />The projected daily sewage flow for this project is calculated at <br />450 qallo~, per day. Based on soil conditions observed on this <br />site, the disposal field will be sised at 45 lineal feet per 150 <br />qallons of projected daily sewage flow. A minimum of 135 lineal <br />feet of disposal field will be required for your proposed develop- <br />ment. The disposal trenches are constructed two (2) feet wide and <br />on minimum ten (10) foot centers and with no line exceeding 125 <br />feet in length. The trenches and perforated pipe are installed <br />level (fl") and contoured to follow the natural ground surface. <br /> <br />The disposal field shall be constructed with equa~.......distribution <br />with a minimum trench depth of 12 inches and a maximum trench <br />depth of 12 inches. There must be at least 16 inches of backfill <br />over the top of the gravel, measured from the natural ground <br />surface. <br /> <br />The sand filter system shall be designed and operated as per OAR <br />340-71-290 through 340-71-305. Detailed plans for the system must <br />be submitted prior to permit issuance. A building permit is <br />required if a site built concrete box is used as the sand filter <br />container. A pamphlet is available in our office which details the <br />requirements for a sand filter system. <br /> <br /> A capping fill is required with this system. The system shall be <br />constructed as indicated on the attached Capping Fill construction detail <br />sheet. <br /> <br /> An effluent lift pump may be necessaz'y to construct the disposal field <br />in the approved area and at the correct depth. <br /> <br /> This approval is site specific to the area tested and the septic system <br />must be located in the immediate area of the test pits unless otherwise autho- <br />rized by this office. A new site evaluation may be required if the system is <br />proposed for a different area on the property. <br /> <br />SPECIAL CONDITIONS: <br /> The drainfields must be constructed within the i~ediate area of the <br /> westerly test pit. The sand filter may need to be elevated to achieve <br /> gravity flow to the shallow drainfield lines. Observe all normal set- <br /> back/separation distances. Refer to the setback list which outlines <br /> minimum separation distances between septic systems and other features. <br /> Note: Construction is limited to the dry ~oil su~er season. This period <br /> is normally between June 1 and October ]. <br /> <br />THIS ,.IS NOT A PERMIT TO INSTALL THE SEPTIC SYSTEM. DO NOT INSTALL THE SYST~ <br />UNTIL A VALID PERMIT HAS BEEN ISSUED BY THIS OFFICE. <br /> <br /> <br />