Laserfiche WebLink
the Director must deny the application. Anyone who disagrees with the Director's decision may appeal the decision to a <br />Marion County hearings officer. The applicant may also request reconsideration (one time only and a $200.00 fee) on the <br />basis of new information subject to signing an extension of the 150-day time limit for review of zoning applications. <br />A public hearing is held on appeals subject to the appellant paying a $250.00 fee. Appeals must be in writing (form available <br />from the Planning Division) and received in the Marion County Planning Division, 5155 Silverton Rd. NE, Salem by 5:00 <br />p.m. on May 7th, 2025. If you have questions about this decision, contact the Planning Division at (503) 588-5038 or at the <br />office. This decision is effective May 8th, 2025, unless appealed. <br />FINDINGS AND CONCLUSIONS: Findings and conclusions on which the decision was based are noted below. <br />1. The subject tract is designated Primary Agriculture in the Marion County Comprehensive Plan and zoned Exclusive <br />Farm Use (EFU). <br />2. The subject tract is comprised of eight tax lots located south of Nusom Rd NE and east of Scism Rd NE. The two <br />eastern properties are bordered by Torvend Rd NE and the Pudding River. The entire tract is in farm use and consists <br />of flat, open fields. There are two other homes on the tract, each lived in by the applicant and family members who <br />operate the farm. The tax lot the proposed dwelling will be located consists of 31.00 acres and contains farm buildings. <br />The entire eastern portion of the property is within the 100-year floodplain. <br />3. The parcel to be developed was described in 1964 (Vol. 582 Page 556) and has not changed its configuration since. <br />The other parcels in the tract have been the subject of multiple property line adjustment land use cases. The subject <br />parcel and entire tract are therefore legal for land use purposes. <br />4. Surrounding properties consist of large parcels involved in farm operations and smaller acreage homesites; all are <br />zoned EFU. <br />5. The applicants propose a secondary farm dwelling for a family member and a farm worker to reside. Both are <br />principally engaged in farm operations. <br />6. According to Marion County Soil Survey, the subject tract consists of 86.1% high value soils. <br />7. Various agencies were contacted with request for comments: <br />Marion County Building Inspection commented: “Manufactured home placement permit is required to be obtained prior <br />to the installation and set up of a manufactured home. Additional permit(s) may be required for those systems or <br />utilities which extend beyond 30 ft from the home.” <br /> <br />Marion County Septic commented: “A Site evaluation is required to establish minimum requirements for an on-site <br />septic system to serve the proposed secondary dwelling. Following the site evaluation, a construction-installation permit <br />will be required for the installation of a system. Any proposed structures must meet a minimum of a 10ft setback to <br />drainlines.” <br />Public Works Land Development and Engineering Permits (LDEP) requested that the following be included in the <br />land use decision. <br />Requirements <br />A. At the time of application for building permits, an Access Permit will be required to document legal access <br />to Torvend Road. <br />B. Transportation System Development Charges (TSDCs) and Parks fee will be assessed at the time of <br />application for building permits. <br />C. New utility service extensions such as electric power originating from the public right -of-way to the <br />property may require a permit from MCPW Engineering. <br />All other contacted agencies either failed to comment or stated no objection to the proposal.