My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AR25-003 Staff Decision
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
2025
>
Administrative Review
>
AR25-003 Staff Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2025 8:26:11 AM
Creation date
4/22/2025 8:26:21 AM
Metadata
Fields
Template:
Land Use
Case_Number
25-003
Document_Date
4/22/2025
Land Use Type
Administrative Review
Tax_Lot_Number
061W200000800
Document_Type
Decision
Site_Address
7292 TORVEND RD NE SILVERTON
Additional Info
061W200001200;1300
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Attention Property Owner: A land use proposal has been submitted for property near where you live or near property you own <br />elsewhere. State law requires that the county notify property owners within a certain distance from this property. The proposal and <br />address of the property is described in the "Application" section below. The decision in this case does not directly affect the zoning <br />or use of your property. If you object to the decision, refer to the "Appeal" section. If you have questions, contact the sta ff person <br />listed at the end of this report. <br />NOTICE OF DECISION <br />ADMINISTRATIVE REVIEW CASE NO. 25-003 <br />APPLICATION: Application of Robert J. Vachter for an administrative review to place a secondary farm dwelling on a <br />tract consisting of 298.12-acres in an EFU (Exclusive Farm Use) zone located at 7292 Torvend RD NE, Silverton (T6S; <br />R1W; Section 19, Tax lots 2300, 2500, 2600; Section 20, Tax Lot 800; Section 29, Tax lots 1200, 1300, 1400; Section 30, <br />Tax lot 600. <br />DECISION: The Planning Director for Marion County has APPROVED the above-described Administrative Review, <br />subject to certain conditions. <br />EXPIRATION DATE: This decision is valid only when exercised by May 7th, 2029, unless an extension is granted. The <br />effective period may be extended for one year subject to approval of an extension. Request for an extension must be <br />submitted to the Planning Division prior to expiration of the approval (form available from the Planning Division). <br />WARNING: A decision approving the proposal is for land use purposes only. Due to septic, well and drainfield <br />replacement areas, this parcel may not be able to support the proposal. To be sure the subject property can accommodate the <br />proposed use the applicant should contact the Building Inspection Division, (503) 588-5147. <br />This decision does not include approval of a building permit. <br />CONDITIONS: <br />1.The applicant shall obtain all permits, including subsurface sewage disposal, required by the Marion County Building <br />Inspection Division. <br />2.The dwelling shall be continuously occupied by a person or persons who are primarily engaged in working on the <br />farm. <br />3.A deed restriction shall be filed with the county clerk requiring removal of the home when the occupancy or use no <br />longer complies with the criteria or standards under which the manufactured home was originally approved of if the <br />parcel is sold out of common ownership. <br />4.The applicants shall sign and record a Farm/Forest & Agricultural Land for Dwelling Qualification Declaratory <br />Statement. The applicants shall record the agreement with the Marion County Clerk’s Office after it has been <br />reviewed and signed by the Planning Director prior to building permits being issued. <br />OTHER PERMITS, FEES AND RESTRICTIONS: This approval does not remove or affect covenants or restrictions <br />imposed on the subject property by deed or other instrument. The proposed use may require permits and/or fees from other <br />local, state or federal agencies. This decision does not take the place of, or relieve the responsibility for, obtaining other <br />permits or satisfying restrictions or conditions thereon. The applicant is advised of the following: <br />5.The applicants should contact the Mt. Angel Fire District to obtain a copy of the District’s Recommended Building <br />Access and Premise Identification regulations and the Marion County Fire Code Applications Guide. Fire District <br />access standards may be more restrictive than County standards <br />6.The applicants should contact Marion County Land Development and Engineering (503-584-7714) for additional <br />Engineering Requirements and Advisories, listed in Finding #7 below, that may be required <br />APPEAL PROCEDURE: The Marion County Zone Code provides that certain applications be considered first by the <br />County Planning Director. If there is any doubt that the application conforms with adopted land use policies and regulations
The URL can be used to link to this page
Your browser does not support the video tag.