My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permit - 1274949
Images9
>
Public Works - Permits
>
Building
>
FOR PUBLIC VIEW ON INTERNET
>
COMPLETED FILES - INACTIVE
>
Road Names
>
Permit - 1274949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2011 11:53:57 AM
Creation date
9/3/2003 11:44:17 AM
Metadata
Fields
Template:
Permits
Permit Address
HALLS RIDGE SUMMIT
Permit City
Detroit
Permit Type
Permit
Permit Site Number
13049
Permit Doc Type
Permit Document
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
All SMR Network and tenant equipment <br />will be protected by a remote control alarm <br />system monitoring building environment <br />and master antenna systems. Propane <br />fueled emergency generating capacity of 35 <br />KW shall be provided to facility tenants. <br />HVAC syste, ms with 3.5,6 BTU cooling and 5 <br />KW of heating capacay shall be installed. <br /> <br />M~,ster antenna systems shall be installed for <br />the 150~ 450, and 800 MHz bands. Bogner <br />antennas shall be operate on the 800 and <br />450 MHz bands.. Cellwave StationMaster <br />antennas shall be made available for the <br />150 MHz operations. ~ Cellwave master <br />combining shall b~ utilized due to superior <br />characteristics and reliability. Master <br />receiver antennas s. hall be ins .killed at top of <br />tower in order to isolate receivers from the <br />transmitter noise environment. Superflex <br />material shall be used inside for all interior <br />RF cabling because of its superior shielding <br />characteristics. - All installed radio <br />eq.uipment not comblned, shall be required <br />to install two stages of ~solat~on and one <br />band pass cavity. AIIpotential users will be <br />subject to an intermodulation study. <br /> <br />Projected Costs ' <br />Sitework, Site Utilities $19,000 <br /> <br />Tower $22,000 <br /> <br />Prefabricated Modules (2) $45,000 <br /> <br />Master Antenna, Combining $30,000 <br /> <br />TOTAL $118,000 <br /> <br />Financial Plan <br /> <br />Outside financing will not be necessary for <br />completion of this project. <br /> <br />(A current financial statement is attached.) <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.