Laserfiche WebLink
Environmental Protection Plan <br /> <br /> The construction of the proposed <br /> communication facility will be strictly <br /> managed on site by SMR Network <br /> personnel. All movement of soil; rock or <br /> plants shall be performed b.y hand where <br /> possible and shall comply with all U.S.D.A. <br /> Forest Service guidelines. ~ <br /> <br /> Site,, Options <br /> <br /> Our response to the~'~licitation' offers two <br /> options for ;~ the ~:placement of" the <br /> development 'on HaHs Ridge. The first <br /> nvo yes ' construct,on of the <br /> option ' <br />improvements in close proximity and to the <br />east of the existing facilities. The advantage <br />of this option is there would not be any <br />,.;:'significant increaserS=in the total area <br />impacted by radio communication facilities. <br />The disadvantage of this option is that it the <br />guy wires of the. pr.0posed tower would cross <br />those of existing:, structures. This <br />configuration is represente~d by Drawing S1, <br /> attached. '; <br /> <br /> The second option involves construction of <br /> the proposed improvements to the south of <br /> the existing facilities, expanding the total <br /> area effected by the communication <br /> facilities to a greater extent than Option 1. <br /> This configuration would allow construction <br /> of the tower without overlapping the guy <br /> radius of other facilities. This configuration is <br /> represented .by Drawing $1 A. Either option <br /> would be suitable to SMR Network. <br /> <br /> <br />