1. In accordance with MCRTSP policy regarding partitioned properties, access to all parcels shall be <br />shared from one (1) connection point to Cloverdale Drive. <br />2. The access approach connection to Cloverdale Drive shall be paved with asphalt. <br />3. Access Permits will be required upon application for building permits for future dwellings. <br />F. With four lots at a minimum of two -acres each, and assuming a maximum of 5000 square feet (sf) per lot <br />of semi- to impervious surfaces, a requirement for stormwater detention is not anticipated. If upon <br />application for building permits greater than 5,000 sf of hardscape were to be proposed on a particular lot, <br />potential need for stormwater disposal utilizing for example an underground exfiltration system, may be <br />stipulated by PW Engineering at that time. <br />G. The subject property is within the unincorporated area of Marion County and will be assessed <br />Transportation & Parks System Development Charges (SDCs) upon application for building permits. <br />H. Any work, including utility work within the public right-of-way such as electrical interconnection, will <br />require separate permits from Public Works. <br />I. Extinguish the Bowser Lane SE access and utility easement created by PP2001-101. <br />J. Acquire any necessary drainage and/or Temporary Construction Easement(s) from the neighboring <br />property(ies) to the east as may be necessary in order to implement the preliminarily -proposed private <br />road drainage crossing. <br />K. Prior to obtaining any building permits, the Subdivision Plat must be recorded. <br />ENGINEERING ADVISORY <br />L. County GIS mapping depicts an unnamed, N-S oriented ephemeral (seasonal) creek traversing the subject <br />property that is overlain by an NWI wetland layer. Applicant is advised that construction of <br />improvements should not block historical or naturally occurring runoff from adjacent properties. <br />Furthermore, site grading should not impact surrounding properties, roads, or drainage ways in a negative <br />manner. <br />M. The local fire district has authority to require, as a condition for plat approval and/or issuance of building <br />permits, that driveways and private easements meet fire district standards for access. <br />N. DEQ regulates erosion control for sites of 1.0-acre plus of total disturbance through issuance of the <br />NPDES 1200-C Construction Stormwater Erosion Permit. This could mean separate permits for the road <br />construction as well as each parcel, depending on disturbed area. <br />Marion County Septic Division commented "Individual site evaluations are required for each lot". <br />Marion County Survey Department commented: <br />1. Subdivision name must be approved per ORS 92.090. <br />2. Must be surveyed and platted per ORS 92.050. <br />3. Subdivision plat must be submitted for review. <br />4. Checking fee and recording fees required. <br />5. Per ORS 92.065 - Remaining monumentation bond may be required if some of the plat monuments have <br />not been set and/or the installation of street and utility improvements has not been completed, or other <br />conditions or circumstances cause the delay (or resetting) of monumentation. <br />6. A current or updated title report must be submitted at the time of review. <br />