Laserfiche WebLink
(c) Prior to plat approval the developer would be required to improve Hollywood Drive <br />along their frontage to appropriate standards as directed by the Public Works <br />department. This will include such elements as pavement widening and overlay, <br />sidewalk, planter strip, and drainage work. <br />(d) Lot 1 (as shown on the applicant's site plan) should be accessed via Stacy Court and not <br />via Hollywood Drive. <br />(e) Prior to plat approval, the applicant shall provide a Declaration of Covenants for Road <br />Maintenance Agreement regarding any non -county maintained access and parking <br />easement used to access any part of the subject property (contact Tedd Joling at (503) <br />584-7714 for details). <br />(1) Construction of roads, dwellings, and related improvements will increase the amount of <br />storm water runoff from the subject property. The County requires any development <br />0.5 acre or larger to provide storm water detention. Underground detention systems are <br />preferred for developments located within the urban growth boundary. The system <br />shall be sized so that it will detain the difference between a 5 -year frequency storm with <br />pre -development conditions and a 10 -year frequency storm with development <br />conditions. <br />(g) Site grading shall not impact surrounding properties, roads, or drainage ways in a <br />negative manner. Construction of improvements on the property shall not block <br />historical or naturally occurring runoff from adjacent properties. Prior to plat approval, <br />the applicant shall provide a storm drainage plan for the site that addresses drainage <br />issues and includes detention elements. In addition, the grading plan shall include <br />existing contours that extend a minimum of twenty feet in each direction from the <br />subdivision boundary. The plan shall also include proposed finish floor elevations, <br />finish grades, and how the proposed contours will match the existing ground. <br />6. Prior to recording the final plat, the applicants shall submit evidence to the Planning Division <br />that all property taxes due to Marion County have been paid in full. <br />7. Any dwelling placed on proposed lot 5 shall be setback 5 feet from the access easement. <br />The developer shall provide head in parking spaces along the south side of proposed lot 1 on <br />the north side of the easement. The parking area be approved by and developed as required by <br />the Marion County Department of Public Works. <br />9. In accordance with Marion County Ordinances and OAR 340-21-060, during the land clearing <br />and road construction phase of this development, dust suppression measures such as water <br />trucks shall be employed as necessary to prevent off site deposition of dust generated by the <br />construction activities or related vehicular traffic on adjacent properties. <br />10. All utilities shall be placed underground. <br />APPEAL P12OCEDURE: This decision may be appealed to the Marion County Board of <br />Commissioners by submitting a written appeal explaining wherein the Marion County Planning <br />Commission's decision is in error, along with a fee of $500.00. The appeal must be received in <br />