My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Decision (2785)
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
Old Cases
>
Staff Decision (2785)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2017 1:44:58 PM
Creation date
10/30/2024 3:14:50 PM
Metadata
Fields
Template:
Land Use
Case_Number
06-027
Document_Date
8/23/2006
Land Use Type
Partition
Tax_Lot_Number
072W07AD03400
Document_Type
Decision
Site_Address
4170 45TH AV NE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Access to both parcels shall be via Milky Way. This will mean reconfiguring the <br />driveway to the existing house, and the reconfigured driveway would also work for a new <br />house on the parcel. <br />Road maintenance agreements would be required for any non -County maintained access <br />easements (such as Milky Way) used by the proposed development. <br />STORM DRAINAGE <br />Site grading shall not impact surrounding properties, roads, or drainage ways in a <br />negative manner. Construction of improvements on the property shall not block historical <br />or naturally occurring runoff from adjacent properties. A site drainage plan may be <br />required to verify this lack of negative impact. <br />GENERAL <br />The subject property is within the urban growth boundary area of the City of Salem. <br />Systems Development Charges shall be assessed upon any development on the newly <br />created parcels at the time of application for building permits. <br />Any utility work in the public right-of-way will require a utility permit from Public <br />Works. <br />Prior to obtaining any building permits, the applicant shall have the Partition plat <br />recorded." <br />The Marion County Surveyor commented that the partitioning must be surveyed and that <br />a final plat (along with the title report and appropriate fees) submitted to their office for <br />their review and approval. <br />The City of Salem Public Works commented that the following conditions should be <br />required for any approvals given. <br />1. A private utility easement for sewer and water shall be required to serve the new <br />parcel at the time of plat approval. <br />2. At the time of development of the new parcel, the following will be required by <br />the City of Salem: 1)sign and record and annexation agreement; 2) sanitary sewer permits <br />and sewer tap obtained; 3)water meter permit; and 4)system development charges and <br />water connection fees paid. Any questions, please call Development Services at (503) <br />588-6211. <br />The Marion County Tax Department commented that all taxes have been paid but a <br />potential additional tax liability may exist which may need to be paid before a partition <br />would be approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.