My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Decision (1842)
Images9
>
Public Works - Planning
>
FOR PUBLIC VIEW ON INTERNET
>
Old Cases
>
Staff Decision (1842)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 12:54:33 PM
Creation date
10/30/2024 3:03:05 PM
Metadata
Fields
Template:
Land Use
Case_Number
02-023
Land Use Type
Partition
Tax_Lot_Number
072W31DB06600
Document_Type
Decision
Site_Address
4135 HAGER ST SE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hager St does not meet current standards for a local urban street. In lieu of <br />requiring immediate construction, the applicant shall provide a non-remonstrance <br />agreement regarding roadway improvements, including sidewalks, paving and <br />drainage, to the local urban road standard along their frontage on the road. A <br />recordable agreement shall be provided before the plat is recorded (form available <br />from Public Works). <br /> <br />h) <br /> <br />Prior to plat approval, the applicant shall provide a storm drainage plan for the <br />site that addresses drainage issues and includes location of the down spouts and <br />slopes onto adjacent properties. <br /> <br />c) <br /> <br />No driveway will be allowed. A driveway exemption permit will be required <br />because of the change in existing access to the public right-of-way. Through the <br />building permit process, the applicant shall be required to apply for a driveway <br />exemption from the permit process. Public Works' staff will review the driveway <br />at that time and determine if it is in compliance with current County standards. If <br />an exemption is denied, the applicant will be required to apply for a driveway <br />permit and make necessary changes to establish a compliant access. <br /> <br />Construction of improvements on the property shall not block historical or <br />naturally occurring runoff from adjacent properties. Site grading shall not impact <br />surrounding properties in a negative manner. <br /> <br />Prior to issuance of any building permits, the applicant shall submit evidence that the <br />access easement has been improved to the standards in Section VII (6) of the Marion <br />County Subdivision and Partitioning Ordinance including a 12 foot wide surface paved <br />with asphalt concrete or Portland cement concrete. The access easement is also to <br />provide for utilities. <br /> <br />The Marion County Planning Division, in coordination with the Mid-Willamette Valley <br />Counsel of Governments, has named the private access easement Little Lane SE. The <br />approved name must be shown on the final partitioning plat and a work order for the <br />street sign installation, with appropriate fee, must be submitted to Marion County <br />Department of Public Works prior to the plat being recorded. The driveway shall be <br />paved. <br /> <br />ADDITIONAL CONDITIONS: Once the approved use is established the following conditions <br />must be continually satisfied: <br /> <br />After the final partitioning plat has been recorded no alteration of property lines shall be <br />permitted without first obtaining approval from the Planning Director. <br /> <br />OTHER PERMITS~ FEES~ AND RESTRICTIONS: This approval does not remove or affect <br />any covenants or restrictions imposed on the subject property by deed or other instrument. The <br />proposed use may require permits and/or fees from other local, State or Federal agencies. This <br />decision does not take the place of, or relieve the responsibility for obtaining other permits or <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.